Coupling Pumped Hydro Energy Storage With Unit Commitment
Authors:
- Kenneth BruninxKBKenneth Bruninx
- Erik DelarueEDErik Delarue
- Hrvoje PandzicHrvoje Pandzic
- William DhaeseleerWDWilliam Dhaeseleer
- 11 December 2015
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Sustainable Energy
- Vol. 7 (2) , 786-796
Abstract
Renewable electricity generation not only provides affordable and emission-free electricity but also introduces additional complexity in the day-ahead planning procedure. To address the stochastic nature of renewable generation, system operators must schedule enough controllable generation to have the flexibility required to compensate unavoidable real-time mismatches between the production and consumption of electricity. This flexibility must be scheduled ahead of real-time and comes at a cost, which should be minimized without compromising the operational reliability of the system. Energy storage facilities, such as pumped hydro energy storage (PHES), can respond quickly to mismatches between demand and generation. Hydraulic constraints on the operation of PHES must be taken into account in the day-ahead scheduling problem, which is typically not done in deterministic models. Stochastic optimization enhances the procurement of flexibility, but requires more computational resources than conventional deterministic optimization. This paper proposes a deterministic and an interval unit commitment formulation for the co-optimization of controllable generation and PHES, including a representation of the hydraulic constraints of the PHES. The proposed unit commitment (UC) models are tested against a stochastic UC formulation on a model of the Belgian power system to compare the resulting operational cost, reliability, and computational requirements. The cost-effective regulating capabilities offered by the PHES yield significant operational cost reductions in both models, while the increase in calculation times is limited.Keywords
This publication has 28 references indexed in Scilit:
- Redispatching in an interconnected electricity system with high renewables penetrationElectric Power Systems Research, 2015
- Applying High Performance Computing to Transmission-Constrained Stochastic Unit Commitment for Renewable Energy IntegrationIEEE Transactions on Power Systems, 2014
- Comparison of scenario reduction techniques for the stochastic unit commitment2014
- A Hybrid Stochastic/Interval Approach to Transmission-Constrained Unit CommitmentIEEE Transactions on Power Systems, 2014
- Transmission, Variable Generation, and Power System FlexibilityIEEE Transactions on Power Systems, 2014
- Uncertainty Sets for Robust Unit CommitmentIEEE Transactions on Power Systems, 2013
- Unified Stochastic and Robust Unit CommitmentIEEE Transactions on Power Systems, 2013
- Adaptive Robust Optimization for the Security Constrained Unit Commitment ProblemIEEE Transactions on Power Systems, 2012
- Conditional Prediction Intervals of Wind Power GenerationIEEE Transactions on Power Systems, 2010
- The Price of RobustnessOperations Research, 2004