Union Gas (Canada)
Type
CompanyLocations
Chatham, CanadaLatest Publications
- 24 September 2018
- Published by ASME International
Third-Party Damage Model for Gas Distribution Pipelines
Third-party damage (TPD) is any damage to underground infrastructure that occurs during work unrelated to the asset. In 2015, there were 10,107 TPD incidents in Canada causing over a billion dollars in estimated damage. TPD is the leading cause of failure for distribution gas pipelines; since distribution pipelines are generally located in areas with high population densities, TPD has significant safety and economic implications. In this study, a probabilistic model is developed to qualify the probability of failure of distribution pipelines due to TPD. The model consists of a fault tree model to quantify the probability of hit given the occurrence of third-party excavation activities and the methodology to evaluate the probability of failure given hit. Fault tree analysis (FTA) is a top down, deductive failure analysis method which uses Boolean logic to combine a series of basic events to analyze the state of a system. Earlier prior research demonstrated the ability of a FTA to quantify the probability of TPD occurring on natural gas transmission pipeline systems. These models allow for a quantitative analysis of preventative measures and, in conjunction with current practices, facilitate a predictive method to plan and optimize resource allocation for damage mitigation and emergency preparedness. The developed TPD model is validated using the data provided from a region in Southwest Ontario. The model will provide distribution companies with a practical tool to identify third-party damage hot spots, develop proactive third-party damage prevention measures, and prioritize damage repair activities using a risk-based approach.
- 24 September 2018
- Published by ASME International
Third-Party Damage Model for Gas Distribution Pipelines
Third-party damage (TPD) is any damage to underground infrastructure that occurs during work unrelated to the asset. In 2015, there were 10,107 TPD incidents in Canada causing over a billion dollars in estimated damage. TPD is the leading cause of failure for distribution gas pipelines; since distribution pipelines are generally located in areas with high population densities, TPD has significant safety and economic implications. In this study, a probabilistic model is developed to qualify the probability of failure of distribution pipelines due to TPD. The model consists of a fault tree model to quantify the probability of hit given the occurrence of third-party excavation activities and the methodology to evaluate the probability of failure given hit. Fault tree analysis (FTA) is a top down, deductive failure analysis method which uses Boolean logic to combine a series of basic events to analyze the state of a system. Earlier prior research demonstrated the ability of a FTA to quantify the probability of TPD occurring on natural gas transmission pipeline systems. These models allow for a quantitative analysis of preventative measures and, in conjunction with current practices, facilitate a predictive method to plan and optimize resource allocation for damage mitigation and emergency preparedness. The developed TPD model is validated using the data provided from a region in Southwest Ontario. The model will provide distribution companies with a practical tool to identify third-party damage hot spots, develop proactive third-party damage prevention measures, and prioritize damage repair activities using a risk-based approach.
- 26 March 2017
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-14
Improving the Quality of ECDA Indirect Inspection Data
The quality of the indirect inspection data is a critical factor in conducting a successful ECDA. It is therefore essential to increase the accuracy of the field data collection, to improve the data processing and to effectively present the results. This paper describes several challenges faced during this continuous improvement process. Techniques for obtaining accurate field data for assessing the risk of AC corrosion are reviewed. Data processing considerations are presented in the context of a case of third-party damage. The implications for similar DCVG indications on the same line are discussed, and a mechanism for these “apparent” DCVG indications is presented. A new format for displaying the data is also presented, allowing a better visual co-ordination between the indications and the site features, as well as allowing immediate assessment of the proposed locations for direct examinations in terms of access and other challenges.
- 26 March 2017
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-14
Improving the Quality of ECDA Indirect Inspection Data
The quality of the indirect inspection data is a critical factor in conducting a successful ECDA. It is therefore essential to increase the accuracy of the field data collection, to improve the data processing and to effectively present the results. This paper describes several challenges faced during this continuous improvement process. Techniques for obtaining accurate field data for assessing the risk of AC corrosion are reviewed. Data processing considerations are presented in the context of a case of third-party damage. The implications for similar DCVG indications on the same line are discussed, and a mechanism for these “apparent” DCVG indications is presented. A new format for displaying the data is also presented, allowing a better visual co-ordination between the indications and the site features, as well as allowing immediate assessment of the proposed locations for direct examinations in terms of access and other challenges.
- 26 September 2016
- Published by ASME International
Probability-Based Sentencing Criteria for Volumetric In-Line Inspection Data
ASME B31.8S, Figure 7.2.1-1 (referred to as Figure 4 in earlier editions of the Standard) is used by many operators of natural gas transmission pipelines to schedule the remediation of corrosion features found via in-line inspection (ILI). The underlying philosophy of this approach is that wall loss features should be repaired before the calculated failure pressure falls below 110% of the maximum allowable operating pressure (MAOP). ASME B31.8S Figure 7.2.1-1 provides a basis for establishing maximum response times as a function of pipeline operating stress level, based in part on assumed corrosion growth rates. The corrosion rates assumed in the derivation of ASME B31.8S Figure 7.2.1-1 depend on the wall thickness of the pipe and the operating stress level as a percent of SMYS. As documented in PHMSA’s March 17, 2016 Notice of Proposed Rulemaking, the 1.1xMAOP repair criterion that forms the basis of Figure 7.2.2-1 has a demonstrated successful history of use in response management for wall loss ILI data. Despite this successful record, some potential exists for the underlying corrosion growth rate assumptions that are incorporated within that criterion to be non-conservative. Under some circumstances, the underlying corrosion growth rate assumption that is incorporated in Figure 7.2.1-1 can be significantly less than that which is provided in the guidance provided in NACE SP0502 (referenced in Appendix B of ASME B31.8S). Therefore, operators should ideally take measures to verify that the growth rate assumptions incorporated within Figure 7.2.1-1 are appropriate for their circumstances before adopting the scheduled response criteria from that Figure. On the other hand, for the majority of circumstances, it could be demonstrated that the Figure 7.2.1-1 criteria may represent overly-conservative response times, particularly where feature-specific information related to corrosion rates are available, and/or can be inferred from ILI data. A desirable solution would be to employ a response time threshold that utilizes the 1.1xMAOP repair criterion that has been demonstrated to be successful through industry’s widespread adoption of the Figure 7.2.2-1 criteria, along with some basis for incorporating feature-specific corrosion growth rates (from ILI data), and additionally, some basis for accounting for tool measurement error. Techniques for estimating the relative probability of failure (Pf) exist that employ ILI data and account for tool measurement error, model error, and tolerances in pipe dimensions and material properties. The problem to date is that probability targets have not been available for use in conjunction with a Pf analysis. Building on previous work done by Kiefner and Kolovich, this paper derives an approach for expressing Pf targets in terms of the 1.1xMAOP repair criterion adopted by ASME B31.8S, Figure 7.2.1-1. The Pf targets are derived using stochastic modeling, and incorporate probability density functions on tool error for feature depth and length, wall thickness, yield strength, and model error. Using a wide range of pipeline material and design parameters, a relationship for establishing lower-bound Pf targets is developed for broad application.
- 26 September 2016
- Published by ASME International
Probability-Based Sentencing Criteria for Volumetric In-Line Inspection Data
ASME B31.8S, Figure 7.2.1-1 (referred to as Figure 4 in earlier editions of the Standard) is used by many operators of natural gas transmission pipelines to schedule the remediation of corrosion features found via in-line inspection (ILI). The underlying philosophy of this approach is that wall loss features should be repaired before the calculated failure pressure falls below 110% of the maximum allowable operating pressure (MAOP). ASME B31.8S Figure 7.2.1-1 provides a basis for establishing maximum response times as a function of pipeline operating stress level, based in part on assumed corrosion growth rates. The corrosion rates assumed in the derivation of ASME B31.8S Figure 7.2.1-1 depend on the wall thickness of the pipe and the operating stress level as a percent of SMYS. As documented in PHMSA’s March 17, 2016 Notice of Proposed Rulemaking, the 1.1xMAOP repair criterion that forms the basis of Figure 7.2.2-1 has a demonstrated successful history of use in response management for wall loss ILI data. Despite this successful record, some potential exists for the underlying corrosion growth rate assumptions that are incorporated within that criterion to be non-conservative. Under some circumstances, the underlying corrosion growth rate assumption that is incorporated in Figure 7.2.1-1 can be significantly less than that which is provided in the guidance provided in NACE SP0502 (referenced in Appendix B of ASME B31.8S). Therefore, operators should ideally take measures to verify that the growth rate assumptions incorporated within Figure 7.2.1-1 are appropriate for their circumstances before adopting the scheduled response criteria from that Figure. On the other hand, for the majority of circumstances, it could be demonstrated that the Figure 7.2.1-1 criteria may represent overly-conservative response times, particularly where feature-specific information related to corrosion rates are available, and/or can be inferred from ILI data. A desirable solution would be to employ a response time threshold that utilizes the 1.1xMAOP repair criterion that has been demonstrated to be successful through industry’s widespread adoption of the Figure 7.2.2-1 criteria, along with some basis for incorporating feature-specific corrosion growth rates (from ILI data), and additionally, some basis for accounting for tool measurement error. Techniques for estimating the relative probability of failure (Pf) exist that employ ILI data and account for tool measurement error, model error, and tolerances in pipe dimensions and material properties. The problem to date is that probability targets have not been available for use in conjunction with a Pf analysis. Building on previous work done by Kiefner and Kolovich, this paper derives an approach for expressing Pf targets in terms of the 1.1xMAOP repair criterion adopted by ASME B31.8S, Figure 7.2.1-1. The Pf targets are derived using stochastic modeling, and incorporate probability density functions on tool error for feature depth and length, wall thickness, yield strength, and model error. Using a wide range of pipeline material and design parameters, a relationship for establishing lower-bound Pf targets is developed for broad application.
- 6 March 2016
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-12
New and Old Challenges in Analyzing ECDA Indirect Inspections Data
The analysis of indirect inspection data is a critical factor in conducting a successful ECDA process. This paper covers two lessons learned recently when dealing with bonded pipelines along common rights-of-way and also with equalization currents. The “old” challenge of differentiating between “threat” related versus “tool” related indications will be also discussed. Topics like attributing a coating holiday to the “right” pipeline in a common right-of-way, differentiating a magnesium anode profile from an equalization current signature and “double dipping” in a DCVG indication are reviewed in detail in this paper.
- 6 March 2016
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-12
New and Old Challenges in Analyzing ECDA Indirect Inspections Data
The analysis of indirect inspection data is a critical factor in conducting a successful ECDA process. This paper covers two lessons learned recently when dealing with bonded pipelines along common rights-of-way and also with equalization currents. The “old” challenge of differentiating between “threat” related versus “tool” related indications will be also discussed. Topics like attributing a coating holiday to the “right” pipeline in a common right-of-way, differentiating a magnesium anode profile from an equalization current signature and “double dipping” in a DCVG indication are reviewed in detail in this paper.
- 15 March 2015
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-10
Lessons Learned During 10 Years of ECDA Application
This paper summarizes the results of ten years of External Corrosion Direct Assessment (ECDA) application on more than 100 projects and includes a number of important lessons learned during the process. The large majority of the ECDA projects resulted in “clean bills of health” for the assessed pipelines. The actual number of direct examinations seldom exceeded the minimum number of digs required by NACE Standard SP 0502-2010.1 Topics like selection of the ECDA regions, influence of pipe depth and local soil resistivity in classifying and prioritizing Direct Current Voltage Gradient (DCVG) indications, dealing with “clipped” gradients and dealing with “false” severe Close Interval Potential Survey (CIPS) indications are discussed in detail in this paper.
- 15 March 2015
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-10
Lessons Learned During 10 Years of ECDA Application
This paper summarizes the results of ten years of External Corrosion Direct Assessment (ECDA) application on more than 100 projects and includes a number of important lessons learned during the process. The large majority of the ECDA projects resulted in “clean bills of health” for the assessed pipelines. The actual number of direct examinations seldom exceeded the minimum number of digs required by NACE Standard SP 0502-2010.1 Topics like selection of the ECDA regions, influence of pipe depth and local soil resistivity in classifying and prioritizing Direct Current Voltage Gradient (DCVG) indications, dealing with “clipped” gradients and dealing with “false” severe Close Interval Potential Survey (CIPS) indications are discussed in detail in this paper.
- 9 March 2014
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-6
Challenges in Analyzing ECDA Indirect Inspections Data
The analysis of indirect inspection data is a critical factor in conducting a successful External Corrosion Direct Assessment (ECDA) process. Any “out of range” data must be validated prior to being considered an ECDA indication. Furthermore, standard methods of validating the accuracy of the field data must be reviewed when special conditions are present. This paper covers a number of lessons learned by dealing with less well-known sources of measurement error, during nine years of ECDA application on more than 100 projects. Topics like “clipped” gradients during the DC Voltage Gradient (DCVG) Survey, AC current drain by well casings during influence testing, and sharp drops in potential indicating the presence of an underground isolating flange are discussed in detail in this paper.
- 9 March 2014
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-6
Challenges in Analyzing ECDA Indirect Inspections Data
The analysis of indirect inspection data is a critical factor in conducting a successful External Corrosion Direct Assessment (ECDA) process. Any “out of range” data must be validated prior to being considered an ECDA indication. Furthermore, standard methods of validating the accuracy of the field data must be reviewed when special conditions are present. This paper covers a number of lessons learned by dealing with less well-known sources of measurement error, during nine years of ECDA application on more than 100 projects. Topics like “clipped” gradients during the DC Voltage Gradient (DCVG) Survey, AC current drain by well casings during influence testing, and sharp drops in potential indicating the presence of an underground isolating flange are discussed in detail in this paper.
- 17 March 2013
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-12
Dealing with Severe Corrosion on a Recently Installed Pipeline
Two leaks were found on a recently installed (1999) pipeline which was coated with extruded polyethylene and protected with directly connected magnesium anodes. This paper describes the use of external corrosion direct assessment (ECDA) principles to identify locations where corrosion could pose a threat to pipeline integrity, and describes the challenges encountered in developing a mitigation program. The reliability of indirect inspection tools along directionally bored sections of pipe, in correlation with special soil conditions, is also discussed.
- 17 March 2013
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-12
Dealing with Severe Corrosion on a Recently Installed Pipeline
Two leaks were found on a recently installed (1999) pipeline which was coated with extruded polyethylene and protected with directly connected magnesium anodes. This paper describes the use of external corrosion direct assessment (ECDA) principles to identify locations where corrosion could pose a threat to pipeline integrity, and describes the challenges encountered in developing a mitigation program. The reliability of indirect inspection tools along directionally bored sections of pipe, in correlation with special soil conditions, is also discussed.
- 1 May 2012
- Published by Association for Materials Protection and Performance (AMPP) in Materials Performance
- Vol. 51 (5) , 45-49
Interpretation of Indirect Inspection Data in the ECDA Process
The interpretation of indirect inspection data is a critical factor in conducting a successful external corrosion direct assessment process. The data must be validated, discrepancies resolved, and indications identified, classified, and prioritized to select the sites for direct examinations. This article analyzes the various types of data provided by indirect inspection tools and their interrelation.
- 1 May 2012
- Published by Association for Materials Protection and Performance (AMPP) in Materials Performance
- Vol. 51 (5) , 45-49
Interpretation of Indirect Inspection Data in the ECDA Process
The interpretation of indirect inspection data is a critical factor in conducting a successful external corrosion direct assessment process. The data must be validated, discrepancies resolved, and indications identified, classified, and prioritized to select the sites for direct examinations. This article analyzes the various types of data provided by indirect inspection tools and their interrelation.
- 11 March 2012
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-8
Use of ECDA Approach in Prioritization of ILI Anomalies
An effective In-line Inspection (ILI) program must provide a prioritized excavation response plan to address anomalies identified as being of particular concern. Locations that show potential for imminent or short term failure are prioritized under Phase 1 and Phase 2 responses respectively. Anomalies that could grow to become a severe risk for pipeline integrity prior to the next ILI are prioritized as Phase 3 excavations. This paper describes the use of External Corrosion Direct Assessment (ECDA) principles in prioritizing Phase 3 anomalies on a gas pipeline in northern Ontario, resulting in a more effective excavation program. A type of ECDA prioritization criterion, based on the results of an integrated Close Interval Potential Survey/Direct Current Voltage Gradient (CIPS/DCVG) survey in conjunction with the results of Phase 1 and Phase 2 digs, is proposed.
- 11 March 2012
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-8
Use of ECDA Approach in Prioritization of ILI Anomalies
An effective In-line Inspection (ILI) program must provide a prioritized excavation response plan to address anomalies identified as being of particular concern. Locations that show potential for imminent or short term failure are prioritized under Phase 1 and Phase 2 responses respectively. Anomalies that could grow to become a severe risk for pipeline integrity prior to the next ILI are prioritized as Phase 3 excavations. This paper describes the use of External Corrosion Direct Assessment (ECDA) principles in prioritizing Phase 3 anomalies on a gas pipeline in northern Ontario, resulting in a more effective excavation program. A type of ECDA prioritization criterion, based on the results of an integrated Close Interval Potential Survey/Direct Current Voltage Gradient (CIPS/DCVG) survey in conjunction with the results of Phase 1 and Phase 2 digs, is proposed.
- 13 March 2011
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-8
Interpretation of Indirect Inspections Data in the ECDA Process
The interpretation of the indirect inspection data is a critical factor in conducting a successful ECDA process. The data must be validated, discrepancies must be resolved, and indications must be identified, classified and prioritized, in order to select the sites for direct examinations. This paper analyzes the various types of data provided by the indirect inspection tools and especially their interrelation. Additional types of indications related to AC and DC interference are also discussed. “Threat related” classification and prioritization criteria, as successfully applied on more than 50 gas pipelines in Ontario, are presented and rationalized. Possible error scenarios resulting from neglecting the interaction between various types of indications are developed from existing sets of data.
- 13 March 2011
- Published by Association for Materials Protection and Performance (AMPP)
- p. 1-8
Interpretation of Indirect Inspections Data in the ECDA Process
The interpretation of the indirect inspection data is a critical factor in conducting a successful ECDA process. The data must be validated, discrepancies must be resolved, and indications must be identified, classified and prioritized, in order to select the sites for direct examinations. This paper analyzes the various types of data provided by the indirect inspection tools and especially their interrelation. Additional types of indications related to AC and DC interference are also discussed. “Threat related” classification and prioritization criteria, as successfully applied on more than 50 gas pipelines in Ontario, are presented and rationalized. Possible error scenarios resulting from neglecting the interaction between various types of indications are developed from existing sets of data.