  • Exploring Vessels from the Offshore Oil and Gas Industry in Design of Deep-Sea Mining Vessels

    by Astrid V. Solheim, Per O. Brett, Jose J. G. Agis, Donna Rhodes, Adam Ross, Bjørn E. Asbjørnslett

    _: In this paper, vessels from the offshore oil and gas industry are explored in the conceptual design of value-robust deep-sea mining vessel solutions. The responsive systems comparison method is applied in a case addressing two hypothetical stakeholders: a mining company and a vessel operator. Their value propositions are outlined and pave the ground for important attributes that consolidate into conceptual vessel design solutions. The cost–benefit trade-offs for various design solutions and technology choices are discussed for different future scenarios. The results indicate that complexity drives high CAPEX generation, yielding so-called gold-plated designs. Lower cost mitigation measures should be taken to ensure future missions of a deep-sea mining vessel. The consequences of design choices on commercial considerations are discussed, such as the vessels’ second-hand value in the market and alternative uses. Keywords: deep-sea mining; offshore vessels; ship design; technology transfer; cost–benefit; scenario-testing

  • Open Access

    What is a ship design firm, really?

    by Benjamin Lagemann, Randi Lunnan, Per Olaf Brett, Jose Jorge Garcia Agis, Astrid Vamråk Solheim, Stein Ove Erikstad

    Ship design is a creative process serving a defined objective. This is normally an iterative process with the design being corrected and adjusted many times until it satisfies this objective. Ship design is taking place in a broader business context consisting of stakeholders providing necessary resources and information to enable the realization of a vessel newbuilding project. Activities performed by different actors, such as customers, suppliers and brokers, are organized by and integrated into a ship design firm. This paper addresses and discusses different ways of organizing integrated design-related activities to deliver on the firm´s value proposition. A value proposition denotes the promised value to a selected customer, and through its value proposition, a ship design firm provides “superior” solutions to a customer’s needs. To enable this solution, a design firm draws on its current resources, including its past knowledge and experiences, and uses these resources in different types of processes, and – in different ways of collaborating with internal and external actors and specialists. In this paper, we draw on approaches from the field of business strategy to understand implications and trade-offs in different logics of value creation processes, how they can be applied in ship design firms, and their implications.


  • Open Access

    Digital Shipbuilding – Needs, challenges, and opportunities

    by Jose Jorge Garcia Agis, Per Olaf Brett

    Ship design firms, shipyards, and ship equipment manufacturers – the shipbuilding industry or just shipbuilding, must adapt their products and services' deliverables to the steadily evolving expectations of the stakeholders in the market. Digitalization and the use of computational tools have been suggested as the effective means to meet such challenges. However, many anecdotal statements and industry recognitions have expressed concern that such efforts have proven less effective than should be expected and promised, and opposite to what many application suppliers advertise. It is argued by this paper that such a situation is experienced because of, among other explanatory factors, incompatibility, lack of proper protocols for information sharing and isolated implementation efforts in single departments rather than a holistic organizational approach. The lack of full understanding of the ship designer's role and responsibility as the main facilitator of such a change process is also recognized as a clear weakness in the effort of successful digitalization of shipbuilding. It is argued that such a vital transformation process cannot be left alone to the software application providers, despite their size and dominance. This paper explains and discusses why this situation is experienced and indicates what improvement measures could be introduced to counteract the opportunity loss. The article addresses five potential digital service deliverables that could complement the existing service delivery of shipbuilding operations and thereby increase competitiveness and market attractiveness. These services include a) vessel support and control centres, b) performance monitoring, c) maintenance management, d) spare part handling, and e) life cycle assessment (LCA). The article also reflects on what implications and consequences this development has on the ship designers' work and their firm's adaptation to new services' demand in the shipbuilding market. The paper concludes with some reflections on the actual implementation of these services, highlighting challenges and further opportunities.


  • Open Access

    Early Marine Systems' Design – Cracking the wicked problem - The case of a novel biomass harvesting vessel

    by Per Olaf Brett, Jose Jorge Garcia Agis, Benjamin Lagemann

    Several IMDC contributions have argued for a better approach to capture stakeholders' expectations in vessel newbuilding projects' execution. The appropriate processes of requirements elucidation are, however, often forgotten or insufficiently handled in traditional ship design and customer-designer settings. Such situations most often reveal a situation in which both "tamed" and "wicked" problems are addressed and must be dealt with properly and effectively at the earliest stage of the process. This paper shows how such problems can be addressed by using the existing multidisciplinary methodology. A practical approach consisting of a set of methods, tools, and work processes integrated into the Accelerated Business Development (ABD) approach is applied to a specific use case, a next-generation factory stern trawler development. A detailed step-by-step story of the early vessel design process – requirements elucidation in parallel with concept design solution development – is outlined following a narrative approach. The process being described covers how necessary support information, stakeholders' expectations identification, business[1]related analyses, specific design layout, onboard comfort, and fish process handling and storage are dealt with effectively and efficiently. This case study exemplifies specific solutions to better handle particularly wicked problem situations, but also tamed problems are addressed systemically. The paper concludes by showing how a final ship design solution can look like and consequently be prepared for and to be built. The handover process and documentation from requirements capture and concept design solution development to further basic design activities are highlighted. The case vessel at hand won the prestigious “ship-of-the-year” award in Norway in 2023. The paper critically discusses what are likely to be the most important factors leading to this outcome.


  • Some relationships between build strategy and shipbuilding time in European shipbuilding

    by Marco Semini, Clara Patek, Per Olaf Brett, Jose Jorge Garcia Agis, Jan Ola Strandhagen, Jørn Vatn

    The build strategy of a ship specifies what is to be produced how, when, where and with what resources. Although it has been emphasised to play an important role in determining shipbuilding time and cost, scientific research on build strategy is limited. In this study, we focus on three interrelated build strategic factors of particular importance in European shipbuilding: hull production offshoring, pre-erection outfitting and the overlap between engineering and production. The study investigates how each of these three factors relates to physical ship production time and to total ship delivery time from contract signing to delivery. We use multiple linear regression on data about European shipyards and the ships they have built, which were obtained from a questionnaire and ship databases. The sample consists of 76 specialised ships, predominantly offshore support vessels, fishing vessels, ferries and other non-cargo carrying vessels, built at 24 European yards. The results provide evidence that yards practicing hull production offshoring have shorter ship production and delivery times than yards building the hulls at their own premises, even though the practice of offshoring itself is likely to have an adverse effect on shipbuilding time. The study also found a significant relationship between the level of pre-erection outfitting and physical production time. On the other hand, overlapping engineering and production only seems to have a limited impact on the production and the delivery time. Several of our results challenge established thinking and provide new insights into the factors affecting production and delivery time in European shipbuilding.


  • An Approach to Measuring Ship Design Complexity

    by A Ebrahimi, S O Erikstad, P O Brett, B E Asbjørnslett

    Understanding different aspects of complexity and measuring them properly are important steps of handling ship design complexity effectively. The main objective of this article is to develop a practical and comprehensive method to measure ship design complexity. In engineering design, complexity is measured today by different indexes and methods. This paper initially explores the applicability of such measures in a ship design context supported by a review of different relevant user-cases. However, it is acknowledged that most of these measurement methods focus on product-related complexity aspects and rarely address or quantify complexities generated by the design process, the organisation of the firm, or the market situation. Therefore, this paper introduces a new and comprehensive model to measure ship design complexity including all these aspects. The model quantifies ship design complexity by means of the following nine different descriptive factors: directional, spatial, decision-making, structural, behavioral, contextual, perceptual, temporal, and technological complexity.

  • Analyzing the factors affecting engineering change implementation performance in the engineer-to-order production environment: case studies from a Norwegian shipbuilding group

    by Natalia Iakymenko, Per Olaf Brett, Erlend Alfnes, Jan Ola Strandhagen

    Engineering changes (ECs) are unavoidable in the engineer-to-order (ETO) environment. ECs improve products and bring additional profit to ETO companies if effectively negotiated and implemented. Despite the abundant relevant literature on EC management, ETO companies still report cost overruns owing to ECs. Here, a multiple case study conducted in a Norwegian shipbuilding group was used to investigate the factors affecting EC implementation performance in complex ETO environments. The factors were examined by a cross-case analysis of six ECs occurring in the shipbuilding projects. Eleven factors were identified and analyzed; their impact on EC cost was assessed by experts. The factors were ranked; the ranking shows three factors having the highest impact: time of EC occurrence, competence and experience of engineering and production staff, and degree of vertical integration in a supply chain. Finally, the study recommends EC management practices and tools to reduce the negative impacts of the identified factors.


  • Quantification of changeability level for engineering systems

    by Carl F. Rehn, Sigurd S. Pettersen, Jose J. Garcia, Per O. Brett, Stein O. Erikstad, Bjørn E. Asbjørnslett, Adam M. Ross, Donna H. Rhodes

    This paper outlines a generic method for quantifying changeability level, to support better decision making in the early stages of design of engineering systems. Changeability represents the ability of a system to change form, function, or operation, and is a collective term for characteristics such as flexibility, adaptability, and agility. Quantification of changeability level must not be confused with valuation of changeability. The level of changeability in a design is essentially under the control of the designer. Two aspects of changeability are discussed, the first being how to structure changeable design alternatives using the Design for Changeability (DFC) variable. The DFC variable represents combinations of path enablers built into a design. Path enablers are characteristics of systems enabling them to change more easily. The second aspect is to quantify the level of changeability for a given design alternative, based on change cost and time. For the latter, we propose two measures for quantification: (1) bottom‐up, measuring the reduction of cost and time enabled for each relevant change, and (2) top‐down, measuring the span of change opportunities at given cost and time thresholds. A case study of a ship is presented to demonstrate the proposed generic method.


  • Improving coordination in an engineer-to-order supply chain using a soft systems approach

    by Mario Henrique Mello, Jonathan Gosling, Mohamed M. Naim, Jan Ola Strandhagen, Per Olaf Brett

    An empirical study in the ship-building sector has been undertaken to understand the problems associated with the coordination of engineer-to-order (ETO) supply chains and to reveal insights into opportunities for improvements based on the application of soft systems methodology. A number of alternatives to improve coordination of supply chain have been proposed based on the comparison between a soft systems model and actual practice. These alternatives were summarised into seven general principles that help define the role of individual companies in coordinating ETO supply chains, highlighting the company’s structures and interdependencies that lead to project tardiness. Due to the specific nature of a project which changes according to the context, it is difficult to generalise the soft systems model. Nevertheless, future research can further explore some of the principles proposed to deal with coordination problems experienced in other types of ETO project operations, such as construction and oil and gas.