    Dual stage pre-excavation grouting methodology with a completely dry tunnel as target. Experiences with an innovative approach during the construction of the Hestnes railroad tunnel, Norway

    by K.G. Holter, M. Hyllseth, H. Strømsvik, K.M. Bøyeie, C.M. Minsaas

    The construction of the Hestnes railroad tunnel in southern Norway, used an innovative pre-excavation grouting (PEG) methodology to achieve a functionally dry tunnel surface of the rock support lining. The final tunnel design was reconsidered, omitting the originally planned cast-in-place concrete lining with a final shotcrete lining. This enabled the achieved result of the PEG works to act as the permanent measure for water ingress control. A dual stage PEG methodology was used. The first grouting stage was based on microcement and targeted a homogenisation of the rock mass. The second stage used a low-viscous mineral based grout, colloidal silica, which successfully enabled the sealing of the finest joints. After completing the excavation of the tunnel, the larger portion of the tunnel was sealed using two grouting rounds only. Some portions required some post-grouting. A reduction the total investment cost and a significant reduction of the CO2-footprint was achieved.


  • Open Access

    Can mindfulness have long-term impact on patients with fibromyalgia? A two-year prospective follow-up study of a mindfulness-based intervention

    by Heidi A. Zangi, Trond Haugmark, Sella Aarrestad Provan

    To examine changes in symptoms and health status in patients with fibromyalgia (FM) 24 months after participating in the mindfulness-based group-program, the Vitality Training (VTP), followed by physical exercise counselling. Seventy-six participants, mean age (range) 43 (26–52), females 69 (91%), diagnosed with FM according to the ACR 2011-criteria received the VTP in a previous randomised controlled trial. Control group participants could receive the VTP after a 12-month observation period, therefore only data from the intervention group were analysed in the present study. Self-reported data were collected electronically at baseline, 3, 12 and 24 months. Outcomes were patient global impression of change (PGIC), FM-severity, i.e. widespread pain (WPI) and symptom severity (SSS), pain, fatigue, sleep quality, psychological distress, motivation and barriers for physical activity, mindfulness and work participation. Trends across time-points were analysed using mixed models for repeated measurements. At 24-months, 48 (56.5%) participants responded, 94% female, median (range) age 46 (28–54), symptom duration 12 (5–33) years. Seven participants reported much/very much better on the PGIC; 21 (44%) reported no change/minimal improvement. Improvements were observed in WPI (-1.9, ES 0.4), SSS (-1.2, ES 0.6), fatigue (-0.8, p =.014) and self-efficacy for physical activity (1.4, ES 0.4). There was a significant trend of reduced WPI, SSS, pain and fatigue across the four time-points, but no additional improvements from 12 to 24-month follow-up. Participants who had completed the VTP demonstrated small to moderate improvements in symptom burden and FM-severity from baseline to 24-month follow-up. Trial registration number: ISRCTN96836577 https://doi.org/10.1186/ISRCTN96836577, prospectively registered 12.07.2016.


  • Tunnel Drammen (Norway) – Solution for excavating a tunnel in loose soil with the presence of groundwater

    by Francisco Gallego, Kajetan Matt, Einar Helgason

    The soil tunnel in Drammen (Norway), part of Bane NOR's ‘New Double Track Drammen–Kobbervikdalen' project, has a length of 290 m; however, the different unfavourable boundary conditions combined with a large excavation cross section (156 m2) make this section the most technically challenging part of the project. The soil tunnel is driven mostly in saturated glaciofluvial sediments, which consist primarily of sand and gravel with a low content of fines, resulting in a low cohesion to cohesionless soil. The groundwater level, always within or above the tunnel section, cannot be lowered during the construction due to project requirements. These geological/hydrogeological conditions together with the large cross section present a high‐risk scenario for any tunnelling project and, in the case of Norway, an unprecedented challenge. Moreover, the tunnel is located in an urban area and has a low overburden of just 8 to 9 m during the first 80 m. For the client it was critical that the design solution was safe, robust, and able to respond to the existing level of uncertainty and potential unexpected occurrences. ILF's design is able to answer these technical challenges while removing many of the typical risks associated to saturated soil tunnelling with a solution that relies mainly on extensive pre‐excavation ground improvement works in the form of jet grouting executed from the surface.


  • Open Access

    Takt Performance Indicators

    by Celine G. Haugen, Ola Lædre, Sigmund Aslesen


  • Open Access

    Want to have an impact on the future?

    by Andreas Sjaastad

  • Open Access

    The design process for achievement of an office living laboratory with a ZEB standard

    by Berit Time, Atle Engebø, Morten Christensen, Ola Dalby, Tore Kvande

    ZEB Laboratory is a full-scale office building with a ZEB-COM ambition, searching a high degree of flexibility and where components and technical systems can be modified for research purposes. Project delivery of a living laboratory with a ZEB standard is not an easy task. The implementation of the ZEB method in a partnering contract as a project delivery model has been developed. This paper describes and elaborate the development of the project delivery and design process for ZEB Laboratory seen by the client. The ZEB Laboratory design and procurement process has given valuable insight and experience into the use of partnering and collaborative elements for planning and production of ZEB buildings.


  • Reputation Management in the AEC-industry after Work-related Crime

    by Atle Engebø, Marie Hammer Iversen, Leif Daniel Houck, Ola Lædre, Jardar Lohne

    Construction companies can be difficult to manage because of complex supply chains, autonomous project managers aiming to maximize net profit, heavy emphasis on price, etc. Another particularity, namely the construction companies' vulnerability for work-related crime, does not receive sufficient attention in the project management literature. In order to study how two major Norwegian contractors managed to safeguard their reputation in the aftermath of the discovery of tax crime and money laundering within their projects, this paper investigates the following research questions: 1) What are the main challenges regarding work-related crime? and 2) How do contractors manage their professional reputation and public image in the aftermath of exposed work-related crime?This is an exploratory study starting with a literature review, followed by a case study consisting of a document study and 12 semi-structured in-depth interviews with representatives on the strategic level. Work-related crime could have a devastating effect on a contractor's reputation. Reputation is perceived to be a vital catalyst for contractors that want to continue in business and conduct projects for reputable clients. Therefore, the most important measure will be to deliver projects according to the agreed price and quality, within the scheduled time, while not compromising either the contract, all the legal jurisdictions aspects or ethical standards. In these particular cases, the contractors perceived their reputation as remaining untarnished due to their successful ad-hoc reputation management. However, the contractors have to do more than just distancing themselves. They must actively prevent criminal actors from entering their projects. This paper is a revised version of the paper (study) published earlier in the proceedings of the Creative Construction Conference 2018 (Engebø et al., 2018).