Xiao Tong
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Xiao Tong has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
Yan Zhao
School of Economics and Management, Hebei University of Architecture
3 shared publicationsZhaolong Li
School of Civil Engineering, Hebei University of Engineering
3 shared publicationsNan Liu
School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China
2 shared publicationsChunhe Wang
1 shared publicationDong Liu
School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing) 1 , Beijing 100083, China
1 shared publicationLongfei Chang
School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China
1 shared publication
Latest Publications
- 15 November 2024
- Published by Taylor & Francis in Mechanics of Advanced Materials and Structures
- Vol. 32 (23) , 5847-5866
Model test study on the mechanical characteristics of shallowly buried covered excavation PBA station construction
- 15 November 2024
- Published by Taylor & Francis in Mechanics of Advanced Materials and Structures
- Vol. 32 (23) , 5847-5866
Model test study on the mechanical characteristics of shallowly buried covered excavation PBA station construction
- Open Access
The Influence of Pile-Beam-Arch Construction on the Stratum and Station Support Structure
The PBA construction method is suitable for urban subway construction in situations with dense traffic and many surrounding buildings and can effectively reduce surface disturbance and control surface subsidence. Based on field-measured data, this study creates numerical finite element models of 3D stratum-structure, studies the influence of each process conversion on the subsidence of the ground surface and the force of the station supporting structure during the construction of the PBA station, and clarifies the optimal construction parameters. The research results show that the consistency between the field monitoring data and the simulation data is more than 80%, which verifies the correctness of the model. It is concluded that the formation of the pile-beam-arch is the main part of the supporting structure and that digging the pilot tunnel and the formation of the beam arch are the control factors of surface settlement. Based on this, the best sequence of pilot tunnel excavation and arch buckle of the two-story two-span station is obtained, and the optimal pilot tunnel excavation scheme of first the middle and then the side, first the upper and then the lower, and the best arch buckle scheme of the synchronous arch buckle on both sides is determined. The results of the research can serve as a guideline when selection the construction parameters for similar PBA stations.
Open AccessThe Influence of Pile-Beam-Arch Construction on the Stratum and Station Support Structure
The PBA construction method is suitable for urban subway construction in situations with dense traffic and many surrounding buildings and can effectively reduce surface disturbance and control surface subsidence. Based on field-measured data, this study creates numerical finite element models of 3D stratum-structure, studies the influence of each process conversion on the subsidence of the ground surface and the force of the station supporting structure during the construction of the PBA station, and clarifies the optimal construction parameters. The research results show that the consistency between the field monitoring data and the simulation data is more than 80%, which verifies the correctness of the model. It is concluded that the formation of the pile-beam-arch is the main part of the supporting structure and that digging the pilot tunnel and the formation of the beam arch are the control factors of surface settlement. Based on this, the best sequence of pilot tunnel excavation and arch buckle of the two-story two-span station is obtained, and the optimal pilot tunnel excavation scheme of first the middle and then the side, first the upper and then the lower, and the best arch buckle scheme of the synchronous arch buckle on both sides is determined. The results of the research can serve as a guideline when selection the construction parameters for similar PBA stations.
- Open Access
- 1 October 2022
- Published by AIP Publishing in AIP Advances
- Vol. 12 (10) , 105006
Behavior of anchor cable bolts with c-shaped tube and cable bolts in shear test
The gradual development of coal mining in deep areas has brought new challenges to the surrounding rock support system. It is imperative to design surrounding rock support elements that exhibit strong tensile and shear resistance and are suitable for pretension load. In this paper, an anchor cable bolt with a c-shaped tube (ACC) is proposed, and in order to study the shear performance of the ACC, the mechanical properties of the ACC and ordinary cable bolts with various diameters and pretension loads are tested. In addition, a comparative analysis is performed to investigate the effect of diameter and pretension load on the shear strength of the ACC and cable bolts. The results show that compared with ordinary cable bolts, the ACC exhibits better shear resistance, where its ability to withstand transverse shear load and shear deformation increased by more than 26.8% and 7.0%, respectively. The diameter and pretension load of the bolt significantly affect its shear performance. The larger the diameter of the bolt, the greater the peak shear load. By increasing the pretension load, the shear load and shear displacement at the peak shear load decrease. The failure of the ACC and ordinary cable bolt is mainly due to a combination of shear and tensile failures. In addition, the action mechanism of the ACC is preliminarily explored, and it provides some references for clarifying the mechanical properties of the ACC.
- 1 October 2022
- Published by AIP Publishing in AIP Advances
- Vol. 12 (10) , 105006
Open AccessBehavior of anchor cable bolts with c-shaped tube and cable bolts in shear test
The gradual development of coal mining in deep areas has brought new challenges to the surrounding rock support system. It is imperative to design surrounding rock support elements that exhibit strong tensile and shear resistance and are suitable for pretension load. In this paper, an anchor cable bolt with a c-shaped tube (ACC) is proposed, and in order to study the shear performance of the ACC, the mechanical properties of the ACC and ordinary cable bolts with various diameters and pretension loads are tested. In addition, a comparative analysis is performed to investigate the effect of diameter and pretension load on the shear strength of the ACC and cable bolts. The results show that compared with ordinary cable bolts, the ACC exhibits better shear resistance, where its ability to withstand transverse shear load and shear deformation increased by more than 26.8% and 7.0%, respectively. The diameter and pretension load of the bolt significantly affect its shear performance. The larger the diameter of the bolt, the greater the peak shear load. By increasing the pretension load, the shear load and shear displacement at the peak shear load decrease. The failure of the ACC and ordinary cable bolt is mainly due to a combination of shear and tensile failures. In addition, the action mechanism of the ACC is preliminarily explored, and it provides some references for clarifying the mechanical properties of the ACC.
- 1 September 2021
- Published by Elsevier in Engineering Failure Analysis
- Vol. 127
Research on the mechanism of asymmetric deformation and stability control of near-fault roadway under the influence of mining
- 1 September 2021
- Published by Elsevier in Engineering Failure Analysis
- Vol. 127
Research on the mechanism of asymmetric deformation and stability control of near-fault roadway under the influence of mining