NRNidhal Rezg
Nidhal Rezg
*This is an algorithmically generated author record based on publicly available information.
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Nidhal Rezg has a total of 33 co-authors. Here are the top co-authors by number of shared publications:
- Zied Achour
Laboratoire de Génie Industriel et Production de Metz, Ile du SAULCY, 57045 Metz, France
7 shared publications - Alexandre Sava
Université de Lorraine, LCOMS, F-57000 Metz, France
4 shared publications - Anis Chelbi
Ecole Supérieure des Sciences et Techniques de Tunis , Centre de Recherche en Productique (CEREP) , 5, av. Taha Hussein, Tunis , Tunisie
4 shared publications - Jérémie Schutz
University Paul Verlaine
4 shared publications - Jean-Baptiste Leger
PREDICT
3 shared publications - Abdelhakim Khatab
Lorraine University
2 shared publications
Latest Publications
- 1 January 2016
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 49 (12) , 1228-1232
Optimal Inspection Policy based on Measurement Quality Degradation: Case of Pitot Sensors System
- 1 January 2016
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 49 (12) , 1228-1232
Optimal Inspection Policy based on Measurement Quality Degradation: Case of Pitot Sensors System
- 27 November 2012
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 25 (4) , 727-737
A condition-based maintenance policy for a production system under excessive environmental degradation
- 27 November 2012
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 25 (4) , 727-737
A condition-based maintenance policy for a production system under excessive environmental degradation
- 5 November 2012
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 25 (3) , 589-602
Joint optimisation of maintenance and production policies with subcontracting and product returns
- 5 November 2012
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 25 (3) , 589-602
Joint optimisation of maintenance and production policies with subcontracting and product returns
- Open Access
- 16 July 2012
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (13) , 3515-3516
Optimisation methods in production, maintenance and logistics
- 16 July 2012
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 50 (13) , 3515-3516
Open AccessOptimisation methods in production, maintenance and logistics
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 968-974
A decision model for adopting an extended two-dimensional warranty considering different maintenance policies with variable customer's behavior
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 968-974
A decision model for adopting an extended two-dimensional warranty considering different maintenance policies with variable customer's behavior
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 975-980
Optimization of cooperative outsourcing between single-outsourcer multiple-subcontractors: a genetic algorithm based approach
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 975-980
Optimization of cooperative outsourcing between single-outsourcer multiple-subcontractors: a genetic algorithm based approach
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 963-967
Maintenance/Production plan optimization taking into account the availability and degradation of manufacturing system
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 963-967
Maintenance/Production plan optimization taking into account the availability and degradation of manufacturing system
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 285-290
A Flight Plan Rescheduling in Air Traffic Management Problem: A Time Discret Event System Approach
- 1 May 2012
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 45 (6) , 285-290
A Flight Plan Rescheduling in Air Traffic Management Problem: A Time Discret Event System Approach
- 10 June 2011
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 24 (1) , 87-97
An integrated strategy for efficient business plan and maintenance plan for systems with a dynamic failure distribution
- 10 June 2011
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 24 (1) , 87-97
An integrated strategy for efficient business plan and maintenance plan for systems with a dynamic failure distribution
- 1 January 2011
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 44 (1) , 5207-5212
Optimal integrated maintenance production strategy with variable production rate for random demand and subcontracting constraint
- 1 January 2011
- Published by Elsevier in IFAC Proceedings Volumes
- Vol. 44 (1) , 5207-5212
Optimal integrated maintenance production strategy with variable production rate for random demand and subcontracting constraint