Greenation International Journal of Engineering Science
Published by Yayasan Dharma Indonesia Tercinta (Dinasti)
- Scilit
- Management Sciences
- Energy Systems & Technologies
- AI & Machine Learning
- Sustainability Studies
- Polymer Science
- Manufacturing
- Operations Management
Publications Analysis
Publications in 2016-2026
Open Access Publications in 2016-2026
- Total Citations
- 10
- Total Publications
- 36
- Average Citations
- 0.28
- Cited Publications
- 6
- Cited Publications %
- 16.7%
- Self Citations
- 0
- Self Citations %
- 0%
- h5_index
- 2
- Monthly Citation Metric (MCM)
- 0.23
- Q1
- 0
- Med
- 0
- Q3
- 1
- 99%
- 4.6
- Max
- 6
- Citing Source Titles
- Citing Publishers
Latest Publications
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 353-368
Integrated Inventory Planning Using Periodic Review and Discrete Event Simulation for Perishable Products in Retail
Perishable products pose inventory management challenges in retail due to their limited shelf life and susceptibility to waste; inventory decisions must balance product availability against excessive stock and lost sales. This study develops an integrated inventory planning framework combining sales forecasting, periodic review inventory policies, and Discrete Event Simulation (DES) to evaluate inventory performance in retail operations. A quantitative simulation-based quasi-experimental design was employed using secondary data from ten retail stores in Indonesia. The dataset comprised daily sales from 1 October to 31 December 2025, shelf life, lead time, minimum order quantity, opening stock, and existing company inventory policies. The DES model simulated daily inventory movements, including replenishment, deliveries, sales, waste, and lost sales, enabling inventory performance evaluation at the product, department, and store levels. Across ten stores, the aggregated waste ratio was 5%, while the lost sales ratio was 4%. At the product level, Leafy A1 recorded waste and lost sales ratios of 2% each, whereas Salad Q14 recorded 13% and 11%, respectively. These variations across products highlight opportunities for improvement in inventory planning. Integrating periodic review policies with daily DES provides a practical framework for evaluating replenishment decisions and identifying inventory performance issues across multiple products and stores. Further research should investigate alternative review periods, dynamic safety stock, improved forecasting accuracy, and product-age tracking to further improve inventory performance and reduce waste.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 353-368
Open AccessIntegrated Inventory Planning Using Periodic Review and Discrete Event Simulation for Perishable Products in Retail
Perishable products pose inventory management challenges in retail due to their limited shelf life and susceptibility to waste; inventory decisions must balance product availability against excessive stock and lost sales. This study develops an integrated inventory planning framework combining sales forecasting, periodic review inventory policies, and Discrete Event Simulation (DES) to evaluate inventory performance in retail operations. A quantitative simulation-based quasi-experimental design was employed using secondary data from ten retail stores in Indonesia. The dataset comprised daily sales from 1 October to 31 December 2025, shelf life, lead time, minimum order quantity, opening stock, and existing company inventory policies. The DES model simulated daily inventory movements, including replenishment, deliveries, sales, waste, and lost sales, enabling inventory performance evaluation at the product, department, and store levels. Across ten stores, the aggregated waste ratio was 5%, while the lost sales ratio was 4%. At the product level, Leafy A1 recorded waste and lost sales ratios of 2% each, whereas Salad Q14 recorded 13% and 11%, respectively. These variations across products highlight opportunities for improvement in inventory planning. Integrating periodic review policies with daily DES provides a practical framework for evaluating replenishment decisions and identifying inventory performance issues across multiple products and stores. Further research should investigate alternative review periods, dynamic safety stock, improved forecasting accuracy, and product-age tracking to further improve inventory performance and reduce waste.
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 342-352
Analysis of Molding Machine Efficiency Using the Overall Equipment Effectiveness (OEE) Method and Six Big Losses to Reduce Product Defects at PT. XYZ
This study aims to evaluate the performance efficiency of molding machines using the Overall Equipment Effectiveness (OEE) method and to identify the main causes of production losses through the Six Big Losses approach and a Fishbone Diagram. The data used consist of machine operational records from January to June 2025. The findings show that the average OEE score is 63.08%, below the company’s standard of 75%. The Six Big Losses analysis indicates that the largest losses are attributed to equipment failures, accounting for 63.45%, followed by reduced speed at 12.70% and idling and minor stoppages at 10.79%. In addition, the Fishbone analysis indicates that the main causes of low OEE are related to machine and personnel factors, including hydraulic system malfunctions, machine overheating, and extended setup times resulting from limitations in operator skills. The proposed improvements focus on implementing preventive maintenance, improving operator skills, and standardizing work procedures. Estimates suggest that these improvements could potentially increase the OEE value to 68.6%. The findings are expected to serve as a basis for improving machine effectiveness and production process efficiency.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 342-352
Open AccessAnalysis of Molding Machine Efficiency Using the Overall Equipment Effectiveness (OEE) Method and Six Big Losses to Reduce Product Defects at PT. XYZ
This study aims to evaluate the performance efficiency of molding machines using the Overall Equipment Effectiveness (OEE) method and to identify the main causes of production losses through the Six Big Losses approach and a Fishbone Diagram. The data used consist of machine operational records from January to June 2025. The findings show that the average OEE score is 63.08%, below the company’s standard of 75%. The Six Big Losses analysis indicates that the largest losses are attributed to equipment failures, accounting for 63.45%, followed by reduced speed at 12.70% and idling and minor stoppages at 10.79%. In addition, the Fishbone analysis indicates that the main causes of low OEE are related to machine and personnel factors, including hydraulic system malfunctions, machine overheating, and extended setup times resulting from limitations in operator skills. The proposed improvements focus on implementing preventive maintenance, improving operator skills, and standardizing work procedures. Estimates suggest that these improvements could potentially increase the OEE value to 68.6%. The findings are expected to serve as a basis for improving machine effectiveness and production process efficiency.
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 329-341
Analysis of Land Use Suitability in Relation to Flood Risk in Belitung Regency
Flooding poses a threat to spatial utilization and community activities in coastal areas, including Belitung Regency. This study analyzes land-use suitability in relation to flood risk to support disaster risk-based spatial utilization control. A descriptive quantitative approach was employed using Geographic Information Systems (GIS). Flood risk was assessed through scoring, weighting, and spatial overlay of hazard and vulnerability parameters, then integrated with existing land-use data to determine suitability. Results show that flood risk was predominantly low, covering 215,220.21 ha (92.98%), followed by moderate risk at 14,941.76 ha (6.46%) and high risk at 1,301.48 ha (0.56%). Land-use suitability was predominantly suitable, covering 230,204.85 ha (99.40%), while conditionally suitable and unsuitable areas accounted for 0.49% and 0.11%, respectively. Residential and non-residential buildings in moderate-risk zones were conditionally suitable, while those in high-risk zones were unsuitable. The findings support spatial utilization control and flood mitigation in Belitung Regency.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 329-341
Open AccessAnalysis of Land Use Suitability in Relation to Flood Risk in Belitung Regency
Flooding poses a threat to spatial utilization and community activities in coastal areas, including Belitung Regency. This study analyzes land-use suitability in relation to flood risk to support disaster risk-based spatial utilization control. A descriptive quantitative approach was employed using Geographic Information Systems (GIS). Flood risk was assessed through scoring, weighting, and spatial overlay of hazard and vulnerability parameters, then integrated with existing land-use data to determine suitability. Results show that flood risk was predominantly low, covering 215,220.21 ha (92.98%), followed by moderate risk at 14,941.76 ha (6.46%) and high risk at 1,301.48 ha (0.56%). Land-use suitability was predominantly suitable, covering 230,204.85 ha (99.40%), while conditionally suitable and unsuitable areas accounted for 0.49% and 0.11%, respectively. Residential and non-residential buildings in moderate-risk zones were conditionally suitable, while those in high-risk zones were unsuitable. The findings support spatial utilization control and flood mitigation in Belitung Regency.
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 318-328
Analysis of the Impact of Downtime Disruptions on SIMRS on the Operational Process of Outpatient Registration Services at AMC Hospital Cileunyi
Downtime refers to the period during which a system's core services are unavailable or inaccessible for a certain period of time due to unexpected disruptions; specifically, the outpatient registration department at AMC Hospital still frequently experiences downtime issues. This study aims to determine the impact of downtime on operational processes in the outpatient registration department. The method used was a descriptive study with a qualitative approach, involving observations and interviews with 10 informants selected through purposive sampling based on inclusion and exclusion criteria. The results showed that the most frequent disruptions occurred between December 2025 and May 2026, with prolonged durations caused by server outages, slow BPJS bridging, and internet connectivity issues. These disruptions forced staff to switch to manual record-keeping, which led to long queues and increased the average registration time from approximately 3 minutes (under normal conditions) to approximately 35 minutes following the downtime. SIMRS downtime significantly reduced the efficiency of outpatient registration services. The hospital is advised to improve its IT infrastructure, increase the number of IT staff, and develop more structured standard operating procedures (SOP) for handling downtime.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 318-328
Open AccessAnalysis of the Impact of Downtime Disruptions on SIMRS on the Operational Process of Outpatient Registration Services at AMC Hospital Cileunyi
Downtime refers to the period during which a system's core services are unavailable or inaccessible for a certain period of time due to unexpected disruptions; specifically, the outpatient registration department at AMC Hospital still frequently experiences downtime issues. This study aims to determine the impact of downtime on operational processes in the outpatient registration department. The method used was a descriptive study with a qualitative approach, involving observations and interviews with 10 informants selected through purposive sampling based on inclusion and exclusion criteria. The results showed that the most frequent disruptions occurred between December 2025 and May 2026, with prolonged durations caused by server outages, slow BPJS bridging, and internet connectivity issues. These disruptions forced staff to switch to manual record-keeping, which led to long queues and increased the average registration time from approximately 3 minutes (under normal conditions) to approximately 35 minutes following the downtime. SIMRS downtime significantly reduced the efficiency of outpatient registration services. The hospital is advised to improve its IT infrastructure, increase the number of IT staff, and develop more structured standard operating procedures (SOP) for handling downtime.
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 308-317
Improving Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Method and Lean Manufacturing in the Automotive Components Industry
Low machine effectiveness can reduce production efficiency through equipment failures, lengthy setup activities, speed losses, and product defects. Previous studies have generally examined machine effectiveness and lean manufacturing separately, leaving limited discussion of their integrated use to identify operational losses and formulate measurable process improvements. This study aims to evaluate machine effectiveness and identify production waste in an automotive manufacturing process to develop improvement strategies. A descriptive quantitative approach was employed using production, operating time, downtime, and defect data collected from January to December 2025. Machine effectiveness was evaluated based on availability, performance, and quality, while lean manufacturing analysis used value stream mapping, process activity mapping, seven wastes, and six major loss categories, supported by Pareto and cause-and-effect analyses. The results showed average availability of 67.39%, performance of 74.16%, quality of 73.42%, and overall effectiveness of 36.56%. Equipment failure was the largest loss at 38.26%, followed by setup and adjustment at 21.39%. The proposed improvements include preventive maintenance, autonomous maintenance, setup time reduction, standardized procedures, operator training, and improved material flow. The novelty lies in integrating machine effectiveness measurement with lean waste analysis to develop a future production state with projected effectiveness of 92.28%.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 308-317
Open AccessImproving Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Method and Lean Manufacturing in the Automotive Components Industry
Low machine effectiveness can reduce production efficiency through equipment failures, lengthy setup activities, speed losses, and product defects. Previous studies have generally examined machine effectiveness and lean manufacturing separately, leaving limited discussion of their integrated use to identify operational losses and formulate measurable process improvements. This study aims to evaluate machine effectiveness and identify production waste in an automotive manufacturing process to develop improvement strategies. A descriptive quantitative approach was employed using production, operating time, downtime, and defect data collected from January to December 2025. Machine effectiveness was evaluated based on availability, performance, and quality, while lean manufacturing analysis used value stream mapping, process activity mapping, seven wastes, and six major loss categories, supported by Pareto and cause-and-effect analyses. The results showed average availability of 67.39%, performance of 74.16%, quality of 73.42%, and overall effectiveness of 36.56%. Equipment failure was the largest loss at 38.26%, followed by setup and adjustment at 21.39%. The proposed improvements include preventive maintenance, autonomous maintenance, setup time reduction, standardized procedures, operator training, and improved material flow. The novelty lies in integrating machine effectiveness measurement with lean waste analysis to develop a future production state with projected effectiveness of 92.28%.
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 294-307
Application of Statistical Process Control (SPC) In Quality Control of Hard Disk Drive Products At PT Ennovi Integrated Engineering Services Batam
Quality control is an essential aspect of manufacturing operations to ensure that products consistently meet predetermined specifications and quality standards. In the hard disk drive manufacturing industry, maintaining process consistency is particularly important because production processes involve high levels of precision and strict quality requirements. This study aims to apply Statistical Process Control (SPC) to evaluate and control the quality of hard disk drive products at PT Ennovi Integrated Engineering Services Batam and to identify the factors contributing to product defects.This study employs a quantitative descriptive approach using Statistical Process Control integrated with selected tools from the Seven Quality Control Tools. The analytical tools consist of Check Sheet, Pareto Chart, Control Chart, and Fishbone Diagram, complemented by Process Capability Index (Cpk) analysis. The Check Sheet is used to systematically record and classify product defects. The Pareto Chart is then applied to determine the dominant defect types based on their frequency of occurrence. The Control Chart is used to evaluate whether the production process remains statistically stable over the observation period. The Fishbone Diagram is applied to identify potential root causes of the dominant defects based on factors related to Man, Machine, Method, Material, Measurement, and Environment. Furthermore, Cpk analysis is used to evaluate the capability of the production process to meet predetermined specification limits. The application of these analytical tools is expected to provide a comprehensive evaluation of product quality, process stability, and process capability. The findings are expected to support the identification of priority quality problems and provide an objective basis for developing corrective and preventive actions to reduce defects and improve the consistency of the hard disk drive production process.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 294-307
Open AccessApplication of Statistical Process Control (SPC) In Quality Control of Hard Disk Drive Products At PT Ennovi Integrated Engineering Services Batam
Quality control is an essential aspect of manufacturing operations to ensure that products consistently meet predetermined specifications and quality standards. In the hard disk drive manufacturing industry, maintaining process consistency is particularly important because production processes involve high levels of precision and strict quality requirements. This study aims to apply Statistical Process Control (SPC) to evaluate and control the quality of hard disk drive products at PT Ennovi Integrated Engineering Services Batam and to identify the factors contributing to product defects.This study employs a quantitative descriptive approach using Statistical Process Control integrated with selected tools from the Seven Quality Control Tools. The analytical tools consist of Check Sheet, Pareto Chart, Control Chart, and Fishbone Diagram, complemented by Process Capability Index (Cpk) analysis. The Check Sheet is used to systematically record and classify product defects. The Pareto Chart is then applied to determine the dominant defect types based on their frequency of occurrence. The Control Chart is used to evaluate whether the production process remains statistically stable over the observation period. The Fishbone Diagram is applied to identify potential root causes of the dominant defects based on factors related to Man, Machine, Method, Material, Measurement, and Environment. Furthermore, Cpk analysis is used to evaluate the capability of the production process to meet predetermined specification limits. The application of these analytical tools is expected to provide a comprehensive evaluation of product quality, process stability, and process capability. The findings are expected to support the identification of priority quality problems and provide an objective basis for developing corrective and preventive actions to reduce defects and improve the consistency of the hard disk drive production process.
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 280-293
Analysis of Defective Jeans Products at RWC Shop Using a U-Control Chart and FMEA
RWC Shop is a small and medium-sized enterprise producing jeans in Pekalongan Regency that continues to encounter product defects that are not detected during the early stages of production. Although the defect rate is relatively low, undetected defects can affect product quality, production efficiency, and business sustainability. This study addresses the limited application of integrated quality control using a u-control chart and Failure Mode and Effects Analysis to identify process control conditions and priority causes of defects. The study aims to evaluate defective product control and determine priority improvement actions. Production and defect data from November 2024 to November 2025 were analyzed using a u-control chart, while interview and assessment data were analyzed using a fishbone diagram and Failure Mode and Effects Analysis. The results show that defect proportions remained within the established control limits. Three major defects were identified: striped products, damaged zippers, and holes. The highest Risk Priority Number was 48, associated with low-quality materials and sewing operator negligence. Recommended improvements include raw-material inspection, supplier evaluation, improved work scheduling, additional workforce, and standardized operating procedures. The novelty lies in integrating statistical process control with systematic failure-risk prioritization for quality improvement in a small-scale jeans manufacturing enterprise.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 280-293
Open AccessAnalysis of Defective Jeans Products at RWC Shop Using a U-Control Chart and FMEA
RWC Shop is a small and medium-sized enterprise producing jeans in Pekalongan Regency that continues to encounter product defects that are not detected during the early stages of production. Although the defect rate is relatively low, undetected defects can affect product quality, production efficiency, and business sustainability. This study addresses the limited application of integrated quality control using a u-control chart and Failure Mode and Effects Analysis to identify process control conditions and priority causes of defects. The study aims to evaluate defective product control and determine priority improvement actions. Production and defect data from November 2024 to November 2025 were analyzed using a u-control chart, while interview and assessment data were analyzed using a fishbone diagram and Failure Mode and Effects Analysis. The results show that defect proportions remained within the established control limits. Three major defects were identified: striped products, damaged zippers, and holes. The highest Risk Priority Number was 48, associated with low-quality materials and sewing operator negligence. Recommended improvements include raw-material inspection, supplier evaluation, improved work scheduling, additional workforce, and standardized operating procedures. The novelty lies in integrating statistical process control with systematic failure-risk prioritization for quality improvement in a small-scale jeans manufacturing enterprise.
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 252-269
Mobile-Based Physician Information System Integrated with Hospital Information System at TK III Ciremai Hospital
The rapid advancement of health information technology has encouraged hospitals to provide fast, accurate, and integrated healthcare services that support physicians' clinical decision-making. At TK III Ciremai Hospital, access to patient information and electronic medical records is currently limited to desktop- and web-based Hospital Information Systems (HIS), restricting physicians' mobility and reducing the efficiency of healthcare service delivery. This study aims to design a mobile-based Physician Information System integrated with the Hospital Information System (HIS) to enable physicians to securely access clinical information through Android smartphones. A qualitative research approach was employed using observation, semi-structured interviews, and document analysis to identify system requirements. The system was designed using the Waterfall software development model, while Java, MySQL, RESTful APIs with JSON data exchange, and Unified Modeling Language (UML), including Use Case Diagrams and Entity Relationship Diagrams (ERD), were utilized to develop the system architecture and database design. The scope of this study is limited to the system design phase and does not include system implementation or performance evaluation. The study produced a prototype design of a mobile-based Physician Information System that provides access to patient demographic information, electronic medical records, laboratory and diagnostic examination results, and physicians' practice schedules while emphasizing data security and usability. The proposed design is expected to serve as a reference for developing integrated mobile physician information systems that improve healthcare service efficiency, enhance physicians' mobility, and support evidence-based clinical decision-making in hospitals.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 252-269
Open AccessMobile-Based Physician Information System Integrated with Hospital Information System at TK III Ciremai Hospital
The rapid advancement of health information technology has encouraged hospitals to provide fast, accurate, and integrated healthcare services that support physicians' clinical decision-making. At TK III Ciremai Hospital, access to patient information and electronic medical records is currently limited to desktop- and web-based Hospital Information Systems (HIS), restricting physicians' mobility and reducing the efficiency of healthcare service delivery. This study aims to design a mobile-based Physician Information System integrated with the Hospital Information System (HIS) to enable physicians to securely access clinical information through Android smartphones. A qualitative research approach was employed using observation, semi-structured interviews, and document analysis to identify system requirements. The system was designed using the Waterfall software development model, while Java, MySQL, RESTful APIs with JSON data exchange, and Unified Modeling Language (UML), including Use Case Diagrams and Entity Relationship Diagrams (ERD), were utilized to develop the system architecture and database design. The scope of this study is limited to the system design phase and does not include system implementation or performance evaluation. The study produced a prototype design of a mobile-based Physician Information System that provides access to patient demographic information, electronic medical records, laboratory and diagnostic examination results, and physicians' practice schedules while emphasizing data security and usability. The proposed design is expected to serve as a reference for developing integrated mobile physician information systems that improve healthcare service efficiency, enhance physicians' mobility, and support evidence-based clinical decision-making in hospitals.
- Open Access
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 270-279
Optimization of Time and Cost For Work Barge Repair Project Using Crashing Method With Trade-Off Cost At Pt Pasifik Karyasindo Perkasa
Ship repair projects are characterized by complex activities, interdependent work processes, and strict completion schedules. Delays in ship repair projects may result in increased operational costs, additional labor costs, and disruptions to the vessel's operational schedule. Therefore, an appropriate scheduling method is required to identify critical activities and determine efficient acceleration alternatives from both time and cost perspectives. This study aims to optimize the time and cost of a Work Barge repair project at PT Pasifik Karyasindo Perkasa by applying the Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), and the crashing method using the Time-Cost Trade-Off approach. The study focuses on accelerating the repair project through additional working hours or overtime without causing disproportionate increases in the project budget. CPM is applied to determine the project network, project duration, and critical activities, while PERT is used to estimate the expected project duration based on optimistic, most likely, and pessimistic time estimates and to determine the probability of project completion. Furthermore, crashing analysis is conducted by comparing normal and crash durations as well as normal and additional overtime costs. The efficiency of each acceleration alternative is determined based on the additional cost required for each unit of time reduction using the cost slope approach. The final analysis is intended to identify the optimal combination of project duration and cost, enabling project acceleration while maintaining cost efficiency and avoiding excessive budget increases.
- 5 September 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (3) , 270-279
Open AccessOptimization of Time and Cost For Work Barge Repair Project Using Crashing Method With Trade-Off Cost At Pt Pasifik Karyasindo Perkasa
Ship repair projects are characterized by complex activities, interdependent work processes, and strict completion schedules. Delays in ship repair projects may result in increased operational costs, additional labor costs, and disruptions to the vessel's operational schedule. Therefore, an appropriate scheduling method is required to identify critical activities and determine efficient acceleration alternatives from both time and cost perspectives. This study aims to optimize the time and cost of a Work Barge repair project at PT Pasifik Karyasindo Perkasa by applying the Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), and the crashing method using the Time-Cost Trade-Off approach. The study focuses on accelerating the repair project through additional working hours or overtime without causing disproportionate increases in the project budget. CPM is applied to determine the project network, project duration, and critical activities, while PERT is used to estimate the expected project duration based on optimistic, most likely, and pessimistic time estimates and to determine the probability of project completion. Furthermore, crashing analysis is conducted by comparing normal and crash durations as well as normal and additional overtime costs. The efficiency of each acceleration alternative is determined based on the additional cost required for each unit of time reduction using the cost slope approach. The final analysis is intended to identify the optimal combination of project duration and cost, enabling project acceleration while maintaining cost efficiency and avoiding excessive budget increases.
- Open Access
- 14 June 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (2) , 224-240
Comparative Analysis of Shoe Size Standards Based on Foot Measurement Methods: Evidence from Indonesian and International Standards
The footwear industry is one of the strategic manufacturing sectors that contributes significantly to economic growth through employment, value creation, and export activities. Accurate shoe sizing is essential to ensure consumer comfort, product quality, and international market competitiveness. This study aimed to compare the Indonesian National Standard (SNI) shoe sizing system with major international sizing systems based on foot measurement methods, evaluate the regulatory implications of SNI implementation, and propose a harmonized sizing framework for the footwear industry. A descriptive comparative approach was employed through literature review, document analysis of national and international standards, comparative evaluation of shoe sizing systems, observation of foot measurement methods, and regulatory analysis. The results indicate that the SNI sizing system has a high level of compatibility with the Mondopoint system because both are based on actual foot length measured in millimeters. In contrast, the European Union, United Kingdom, and United States sizing systems use different numbering principles that require conversion. A Mondopoint-based dual-labeling approach is proposed to improve sizing accuracy, reduce product returns, facilitate international trade, and strengthen the competitiveness of Indonesian footwear products. These findings provide practical support for future footwear standardization policies and industrial implementation.
- 14 June 2026
- Published by Yayasan Dharma Indonesia Tercinta (Dinasti) in Greenation International Journal of Engineering Science
- Vol. 4 (2) , 224-240
Open AccessComparative Analysis of Shoe Size Standards Based on Foot Measurement Methods: Evidence from Indonesian and International Standards
The footwear industry is one of the strategic manufacturing sectors that contributes significantly to economic growth through employment, value creation, and export activities. Accurate shoe sizing is essential to ensure consumer comfort, product quality, and international market competitiveness. This study aimed to compare the Indonesian National Standard (SNI) shoe sizing system with major international sizing systems based on foot measurement methods, evaluate the regulatory implications of SNI implementation, and propose a harmonized sizing framework for the footwear industry. A descriptive comparative approach was employed through literature review, document analysis of national and international standards, comparative evaluation of shoe sizing systems, observation of foot measurement methods, and regulatory analysis. The results indicate that the SNI sizing system has a high level of compatibility with the Mondopoint system because both are based on actual foot length measured in millimeters. In contrast, the European Union, United Kingdom, and United States sizing systems use different numbering principles that require conversion. A Mondopoint-based dual-labeling approach is proposed to improve sizing accuracy, reduce product returns, facilitate international trade, and strengthen the competitiveness of Indonesian footwear products. These findings provide practical support for future footwear standardization policies and industrial implementation.