Egis (France)
Type
CompanyLocations
Guyancourt, FranceLatest Publications
- Open Access
- 27 November 2026
- Published by Pensoft Publishers in Nature Conservation
- Vol. 66, 155-185
Ecosystem services provision as a function of restoration scale in Arcachon Bay, France
Arcachon Bay, located in the Nouvelle-Aquitaine region of France, hosts Europe’s largest Zostera seagrass bed, which has experienced significant decline over recent decades. Although restoration is being considered, current efforts are small to medium scale. The study aims to demonstrate the benefits of upscaling Zostera seagrass restoration to enhance key services for disaster risk reduction and climate adaptation, combined with biodiversity gains. To do so, the study emphasises the connection between the natural system and the socio-economic system, addressing technical challenges related to data metrics availability, and proposes a three-layer systemic modelling approach to evaluate the achievement of management goals as a function of the restoration scale. The first layer involves an eco-morphodynamic modelling system to simulate natural system dynamics, including hydrodynamics and morphological changes. The second layer is a conceptual socio-economic system model that links socio-economic activities to ecosystem services provided by seagrass beds. The third layer evaluates the impact of restoration actions on ecosystem services, considering different restoration scales and climate change scenarios. Results indicate that large-scale restoration generally improves the control of sediment dynamics, reduces turbidity, and positively impacts water renewal times, particularly in the northern and eastern parts of the bay. However, partial restoration may yield better outcomes for certain ecosystem goals, such as water quality improvement and control of sediment dynamics in the innermost parts of the bay. The study underscores the importance of considering both physical and socio-economic drivers to achieve successful large-scale restoration. Sea-level rise is identified as a key physical driver influencing the system’s response, while socio-economic factors such as land use, urbanisation, and navigation activities also play significant roles. The findings highlight the potential of large-scale seagrass restoration to enhance biodiversity, improve ecosystem services delivery, and contribute to climate adaptation and disaster risk reduction. The study provides a framework for evaluating restoration interventions and emphasises the need for integrated approaches that consider both natural system dynamics and socio-economic factors.
- 27 November 2026
- Published by Pensoft Publishers in Nature Conservation
- Vol. 66, 155-185
Open AccessEcosystem services provision as a function of restoration scale in Arcachon Bay, France
Arcachon Bay, located in the Nouvelle-Aquitaine region of France, hosts Europe’s largest Zostera seagrass bed, which has experienced significant decline over recent decades. Although restoration is being considered, current efforts are small to medium scale. The study aims to demonstrate the benefits of upscaling Zostera seagrass restoration to enhance key services for disaster risk reduction and climate adaptation, combined with biodiversity gains. To do so, the study emphasises the connection between the natural system and the socio-economic system, addressing technical challenges related to data metrics availability, and proposes a three-layer systemic modelling approach to evaluate the achievement of management goals as a function of the restoration scale. The first layer involves an eco-morphodynamic modelling system to simulate natural system dynamics, including hydrodynamics and morphological changes. The second layer is a conceptual socio-economic system model that links socio-economic activities to ecosystem services provided by seagrass beds. The third layer evaluates the impact of restoration actions on ecosystem services, considering different restoration scales and climate change scenarios. Results indicate that large-scale restoration generally improves the control of sediment dynamics, reduces turbidity, and positively impacts water renewal times, particularly in the northern and eastern parts of the bay. However, partial restoration may yield better outcomes for certain ecosystem goals, such as water quality improvement and control of sediment dynamics in the innermost parts of the bay. The study underscores the importance of considering both physical and socio-economic drivers to achieve successful large-scale restoration. Sea-level rise is identified as a key physical driver influencing the system’s response, while socio-economic factors such as land use, urbanisation, and navigation activities also play significant roles. The findings highlight the potential of large-scale seagrass restoration to enhance biodiversity, improve ecosystem services delivery, and contribute to climate adaptation and disaster risk reduction. The study provides a framework for evaluating restoration interventions and emphasises the need for integrated approaches that consider both natural system dynamics and socio-economic factors.
- 3 September 2025
- Published by Structurae
- p. 1
Long-Span Low-Carbon Footbridge over the Railway in Creil
The urban footbridge project pays tribute to Creil’s industrial past while embracing a sustainable, post-carbon future. Designed for openness and material efficiency, its structure adapts to long spans.At both ends, cantilevered expansions house ramps, stairs, and elevators, doubling as urban belvederes with panoramic views of the northern and southern slopes.Spiral ramps extend from these belvederes, offering cyclists seamless access to the city’s new public spaces- leading north into a garden and south onto a landscaped plaza.
- 3 September 2025
- Published by Structurae
- p. 1
Long-Span Low-Carbon Footbridge over the Railway in Creil
The urban footbridge project pays tribute to Creil’s industrial past while embracing a sustainable, post-carbon future. Designed for openness and material efficiency, its structure adapts to long spans.At both ends, cantilevered expansions house ramps, stairs, and elevators, doubling as urban belvederes with panoramic views of the northern and southern slopes.Spiral ramps extend from these belvederes, offering cyclists seamless access to the city’s new public spaces- leading north into a garden and south onto a landscaped plaza.
- 1 January 2025
- Published by International Association for Bridge and Structural Engineering (IABSE)
- Vol. 121, 1622-1629
New Road Bridge at the Border Crossing Kipi-Ipsala – Mastering Substantial Challenges from Conception to Completion
The presented project represents a new highway link between Greece and Turkey at the border crossing Kipi-Ipsala. It consists of a central 400 m 3-span extradosed bridge over the Evros (Meric) river and prefabricated girder approach bridges with 150 and 291 m length respectively.The paper describes the technical solutions and design considerations to meet the functional and technical demands of the project as well as requirements with respect to sustainability and ecological compatibility. It also presents the models used to analyse the structures throughout its construction stages, service life and seismic conditions. The focus is on illustrating, how advanced digital techniques for modelling and analysis were used to ensure the structural integrity throughout lifetime.
- 1 January 2025
- Published by International Association for Bridge and Structural Engineering (IABSE)
- Vol. 121, 1622-1629
New Road Bridge at the Border Crossing Kipi-Ipsala – Mastering Substantial Challenges from Conception to Completion
The presented project represents a new highway link between Greece and Turkey at the border crossing Kipi-Ipsala. It consists of a central 400 m 3-span extradosed bridge over the Evros (Meric) river and prefabricated girder approach bridges with 150 and 291 m length respectively.The paper describes the technical solutions and design considerations to meet the functional and technical demands of the project as well as requirements with respect to sustainability and ecological compatibility. It also presents the models used to analyse the structures throughout its construction stages, service life and seismic conditions. The focus is on illustrating, how advanced digital techniques for modelling and analysis were used to ensure the structural integrity throughout lifetime.
- Open Access
- 16 July 2021
- Published by American Geophysical Union (AGU) in Water Resources Research
- Vol. 57 (7)
Overtopping‐Induced Failure of Non–Cohesive Homogeneous Fluvial Dikes: Effect of Dike Geometry on Breach Discharge and Widening
Laboratory experiments were conducted to assess the influence of dike geometry on the breaching of non‐cohesive homogeneous fluvial dikes. Both the channel‐side and floodplain‐side dike slopes and the crest length were varied systematically. The time‐evolution of the breach discharge and breach width was monitored. Dikes having a larger volume per unit width lead to a more gradual increase in breach discharge and in breach width during the first stage of breach expansion (i.e., phase of rapid erosion). In contrast, the later stage of gradual breach widening is less influenced by the dike geometry. The breach hydrographs were observed to follow three distinct patterns, which are explained based on the relative magnitude of two characteristic time scales and of a normalized form of the dike unit volume.
- 16 July 2021
- Published by American Geophysical Union (AGU) in Water Resources Research
- Vol. 57 (7)
Open AccessOvertopping‐Induced Failure of Non–Cohesive Homogeneous Fluvial Dikes: Effect of Dike Geometry on Breach Discharge and Widening
Laboratory experiments were conducted to assess the influence of dike geometry on the breaching of non‐cohesive homogeneous fluvial dikes. Both the channel‐side and floodplain‐side dike slopes and the crest length were varied systematically. The time‐evolution of the breach discharge and breach width was monitored. Dikes having a larger volume per unit width lead to a more gradual increase in breach discharge and in breach width during the first stage of breach expansion (i.e., phase of rapid erosion). In contrast, the later stage of gradual breach widening is less influenced by the dike geometry. The breach hydrographs were observed to follow three distinct patterns, which are explained based on the relative magnitude of two characteristic time scales and of a normalized form of the dike unit volume.
- 16 June 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (3) , 256-264
A TBM assembly cavern in the French Alps
This paper deals with the cross‐border section of the Lyon‐Turin Line, i.e. the 57.5 km long Mont Cenis Base Tunnel between Saint Jean de Maurienne in France and the Susa valley in Italy. Works at Saint Martin La Porte started in 2015 including the 9 km TBM excavation along the south tube of the base tunnel between the access adits of Saint Martin La Porte and La Praz. In order to assemble the TBM, a large underground cavern has been excavated at the end of the Saint Martin La Porte access adit. The size of this cavern, with a length of approximately 45 m, a span of 23 m and a height of 22.2 m, and the geological and geomechanical conditions in the Carboniferous Formation at a depth of about 600 m made this work a challenge. The excavation and support methods adopted are described, together with the rock mass conditions and the observed ground behaviour. The monitoring data obtained during excavation are briefly presented, including the works schedule.
- 16 June 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (3) , 256-264
A TBM assembly cavern in the French Alps
This paper deals with the cross‐border section of the Lyon‐Turin Line, i.e. the 57.5 km long Mont Cenis Base Tunnel between Saint Jean de Maurienne in France and the Susa valley in Italy. Works at Saint Martin La Porte started in 2015 including the 9 km TBM excavation along the south tube of the base tunnel between the access adits of Saint Martin La Porte and La Praz. In order to assemble the TBM, a large underground cavern has been excavated at the end of the Saint Martin La Porte access adit. The size of this cavern, with a length of approximately 45 m, a span of 23 m and a height of 22.2 m, and the geological and geomechanical conditions in the Carboniferous Formation at a depth of about 600 m made this work a challenge. The excavation and support methods adopted are described, together with the rock mass conditions and the observed ground behaviour. The monitoring data obtained during excavation are briefly presented, including the works schedule.
- Open Access
- 1 March 2017
- Published by Elsevier in Chemosphere
- Vol. 170, 1-9
Carbonaceous and nitrogenous disinfection by-product formation from algal organic matter
- 1 March 2017
- Published by Elsevier in Chemosphere
- Vol. 170, 1-9
Open AccessCarbonaceous and nitrogenous disinfection by-product formation from algal organic matter
- 1 January 2014
- Published by Emerald Publishing
- p. 306-315
EMACOP Project: Assessment of Wave Energy Resource Along France’s Coastlines
- 1 January 2014
- Published by Emerald Publishing
- p. 306-315
EMACOP Project: Assessment of Wave Energy Resource Along France’s Coastlines
- 1 October 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 19, 645-648
CityGML and IFC: Going further than LOD
Modeling a built environment for any construction project or asset management is usually limited to a simple 3D visualization. Data and metadata related to modeled objects are not included sufficiently in the modeling, especially for infrastructures. In addition, the needs of the construction industry are constantly changing: we mainly retain in a lot of projects, concurrent engineering, life cycle analysis and the implementation of the European Directive INSPIRE. These changes in the design and building practices require large flows of information that cannot be left to self-organization. Furthermore, the information flow from the project to the built heritage is sequenced. Following these findings, we examined the existing data models for the construction trades such as CityGML and IFC. Both of these standards provide in principle to manage design, construction and operation of a project. Firstly, this paper shows the reason for which we believe that the approach by these two standards is not sufficient to structure information in urban and infrastructure projects, considering design but also long-term operation of built structures. In addition, we discuss the fact that IFC and CityGML data models respectively integrate Level Of Development and Level Of Detail which differ in their name and also in their content. We will explain our interpretation of these two kinds of levels. Finally, we discuss about adding other levels types which are needed to make the data model more structured and consistent to the various demands and needs that must respond, from the beginning of the project to the asset management.
- 1 October 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 19, 645-648
CityGML and IFC: Going further than LOD
Modeling a built environment for any construction project or asset management is usually limited to a simple 3D visualization. Data and metadata related to modeled objects are not included sufficiently in the modeling, especially for infrastructures. In addition, the needs of the construction industry are constantly changing: we mainly retain in a lot of projects, concurrent engineering, life cycle analysis and the implementation of the European Directive INSPIRE. These changes in the design and building practices require large flows of information that cannot be left to self-organization. Furthermore, the information flow from the project to the built heritage is sequenced. Following these findings, we examined the existing data models for the construction trades such as CityGML and IFC. Both of these standards provide in principle to manage design, construction and operation of a project. Firstly, this paper shows the reason for which we believe that the approach by these two standards is not sufficient to structure information in urban and infrastructure projects, considering design but also long-term operation of built structures. In addition, we discuss the fact that IFC and CityGML data models respectively integrate Level Of Development and Level Of Detail which differ in their name and also in their content. We will explain our interpretation of these two kinds of levels. Finally, we discuss about adding other levels types which are needed to make the data model more structured and consistent to the various demands and needs that must respond, from the beginning of the project to the asset management.
- 1 June 2011
- Published by Elsevier in Computers and Geotechnics
- Vol. 38 (4) , 515-525
Experimental and numerical study of the behavior of a reinforced-earth wall subjected to a local load
- 1 June 2011
- Published by Elsevier in Computers and Geotechnics
- Vol. 38 (4) , 515-525
Experimental and numerical study of the behavior of a reinforced-earth wall subjected to a local load