Construction Industry Institute
Types
Nonprofit, FunderLocations
Austin, United StatesLatest Publications
- 27 August 2026
- Published by American Society of Civil Engineers (ASCE)
- p. 857-865
A Collaborative Risk-Based Methodology for Cost Contingency Estimation in Construction Projects
- 27 August 2026
- Published by American Society of Civil Engineers (ASCE)
- p. 857-865
A Collaborative Risk-Based Methodology for Cost Contingency Estimation in Construction Projects
- 26 May 2026
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- p. 1-19
Differences and challenges in collaborative risk management across different project delivery methods
Purpose: This study examines how project delivery methods shape the implementation of collaborative risk management in construction projects. Moving beyond traditional performance comparisons, the study adopts a grounded theory approach to identify the underlying factors that explain differences in collaborative risk management. It further identifies key challenges across various aspects of collaboration and explains how these challenges affect the effectiveness of risk management processes. Design/methodology/approach: A grounded theory approach was used, drawing on semi-structured interviews with 21 subject matter experts with extensive experience in heavy industrial construction projects. Qualitative analysis was conducted to identify patterns and themes, and theoretical sampling guided iterative data collection until theoretical saturation was reached. Findings: The findings identify four interrelated themes (Stakeholder Collaboration and Engagement; Integration of Risk Management Across the Project Lifecycle; Risk Sharing and Communication; and Roles and Responsibilities) that together explain how project delivery methods shape collaborative risk management. Within each theme, specific categories further describe the underlying factors influencing collaboration. The results demonstrate that no single project delivery method is universally better than the others. Rather, each presents distinct challenges that influence how risks are managed. In addition, factors such as project complexity, contracting strategy, and the risk management maturity of project stakeholders play a critical role in shaping the effectiveness of collaborative risk management processes. Originality/value: This study fills a gap in the literature by providing a qualitative analysis of collaborative risk management practices across multiple project delivery methods. It offers practical insights for aligning contractual and organizational arrangements with collaborative risk management objectives and provides a foundation for future approaches that enhance transparency and stakeholder engagement.
- 26 May 2026
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- p. 1-19
Differences and challenges in collaborative risk management across different project delivery methods
Purpose: This study examines how project delivery methods shape the implementation of collaborative risk management in construction projects. Moving beyond traditional performance comparisons, the study adopts a grounded theory approach to identify the underlying factors that explain differences in collaborative risk management. It further identifies key challenges across various aspects of collaboration and explains how these challenges affect the effectiveness of risk management processes. Design/methodology/approach: A grounded theory approach was used, drawing on semi-structured interviews with 21 subject matter experts with extensive experience in heavy industrial construction projects. Qualitative analysis was conducted to identify patterns and themes, and theoretical sampling guided iterative data collection until theoretical saturation was reached. Findings: The findings identify four interrelated themes (Stakeholder Collaboration and Engagement; Integration of Risk Management Across the Project Lifecycle; Risk Sharing and Communication; and Roles and Responsibilities) that together explain how project delivery methods shape collaborative risk management. Within each theme, specific categories further describe the underlying factors influencing collaboration. The results demonstrate that no single project delivery method is universally better than the others. Rather, each presents distinct challenges that influence how risks are managed. In addition, factors such as project complexity, contracting strategy, and the risk management maturity of project stakeholders play a critical role in shaping the effectiveness of collaborative risk management processes. Originality/value: This study fills a gap in the literature by providing a qualitative analysis of collaborative risk management practices across multiple project delivery methods. It offers practical insights for aligning contractual and organizational arrangements with collaborative risk management objectives and provides a foundation for future approaches that enhance transparency and stakeholder engagement.
- 1 May 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 15 (2) , 04523002
Role of BIM Contract Practices in Stakeholder BIM Implementation on AEC Projects
The growth of building information modeling (BIM) adoption in the architectural, engineering, and construction (AEC) industry has changed project delivery and contract strategies. While there are numerous BIM contract documents available, how these contract documents are implemented is not well understood. This research investigates how BIM contract practices impact stakeholders’ BIM implementation in AEC projects. A mixed-methods approach was implemented using a survey and semistructured interviews. Researchers analyzed survey data using Fisher’s exact test and found significant associations between stakeholder BIM use and their respective BIM contractual requirements, as well as BIM execution plan implementation and its respective contractual requirement. Researchers then implemented a qualitative analysis approach with semistructured interviews of AEC professionals to identify specific contract requirements impacting BIM implementation and contract-related BIM challenges on current projects. The main categories of contract requirements impacting BIM implementation were contract deliverables, BIM-related meetings, workflow documents, and software requirements. The main categories of contract-related BIM challenges were related to model challenges, reliance on 2D contract documents, the lack of BIM standard practice implementation, and BIM regulatory challenges. These findings can support practitioners when identifying and implementing BIM contract strategies to positively impact BIM adoption in AEC projects.
- 1 May 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 15 (2) , 04523002
Role of BIM Contract Practices in Stakeholder BIM Implementation on AEC Projects
The growth of building information modeling (BIM) adoption in the architectural, engineering, and construction (AEC) industry has changed project delivery and contract strategies. While there are numerous BIM contract documents available, how these contract documents are implemented is not well understood. This research investigates how BIM contract practices impact stakeholders’ BIM implementation in AEC projects. A mixed-methods approach was implemented using a survey and semistructured interviews. Researchers analyzed survey data using Fisher’s exact test and found significant associations between stakeholder BIM use and their respective BIM contractual requirements, as well as BIM execution plan implementation and its respective contractual requirement. Researchers then implemented a qualitative analysis approach with semistructured interviews of AEC professionals to identify specific contract requirements impacting BIM implementation and contract-related BIM challenges on current projects. The main categories of contract requirements impacting BIM implementation were contract deliverables, BIM-related meetings, workflow documents, and software requirements. The main categories of contract-related BIM challenges were related to model challenges, reliance on 2D contract documents, the lack of BIM standard practice implementation, and BIM regulatory challenges. These findings can support practitioners when identifying and implementing BIM contract strategies to positively impact BIM adoption in AEC projects.
- 1 March 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 149 (3) , 04022185
Qualitative Analysis of the Impact of Contracts on Information Management in AEC Projects
Project information management in architecture, engineering, and construction (AEC) projects can be a challenging endeavor due to the complex nature of projects and the numerous sources and types of information required, including drawings, plans, specifications, and building information modeling (BIM), among others. AEC projects require stakeholders to develop temporary teams, develop work processes, and collaborate across organizational boundaries. Additionally, the numerous technologies used in information management, such as project management software, scheduling software, and BIM, require contractual agreements among project stakeholders to address these technologies’ potential risks while still allowing stakeholder collaboration to benefit project execution and delivery. Contracts are used to define project requirements and can be used to define different aspects of project information management, like required deliverables or stakeholder roles and responsibilities. While recent research has evaluated the relationship between BIM and contracts, there is a gap in understanding the relationship between contracts and information management more holistically. The objectives of this research were to gain insight into how contracts impact information management, identify barriers that exist in contracts related to information management, and to develop potential contract-related strategies to improve information management on AEC projects. Researchers implemented a qualitative analysis approach through semistructured interviews with 38 AEC professionals and the application of a systematic and iterative qualitative coding process. This research found that contracts can be used as a tool to influence the development and execution of project information management strategies. Specifically, contracts can be used to define deliverables, workflows, and software, as well as templates and forms. While interviewees discussed many contract-related challenges, they also proposed potential contract-related strategies to improve project information management. These strategies encompass three main categories: improving contract compliance, contract flexibility, and setting expectations. These findings provide insight into how contracts can impact project information management and provide practitioners with specific contract strategies to improve project information management.
- 1 March 2023
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 149 (3) , 04022185
Qualitative Analysis of the Impact of Contracts on Information Management in AEC Projects
Project information management in architecture, engineering, and construction (AEC) projects can be a challenging endeavor due to the complex nature of projects and the numerous sources and types of information required, including drawings, plans, specifications, and building information modeling (BIM), among others. AEC projects require stakeholders to develop temporary teams, develop work processes, and collaborate across organizational boundaries. Additionally, the numerous technologies used in information management, such as project management software, scheduling software, and BIM, require contractual agreements among project stakeholders to address these technologies’ potential risks while still allowing stakeholder collaboration to benefit project execution and delivery. Contracts are used to define project requirements and can be used to define different aspects of project information management, like required deliverables or stakeholder roles and responsibilities. While recent research has evaluated the relationship between BIM and contracts, there is a gap in understanding the relationship between contracts and information management more holistically. The objectives of this research were to gain insight into how contracts impact information management, identify barriers that exist in contracts related to information management, and to develop potential contract-related strategies to improve information management on AEC projects. Researchers implemented a qualitative analysis approach through semistructured interviews with 38 AEC professionals and the application of a systematic and iterative qualitative coding process. This research found that contracts can be used as a tool to influence the development and execution of project information management strategies. Specifically, contracts can be used to define deliverables, workflows, and software, as well as templates and forms. While interviewees discussed many contract-related challenges, they also proposed potential contract-related strategies to improve project information management. These strategies encompass three main categories: improving contract compliance, contract flexibility, and setting expectations. These findings provide insight into how contracts can impact project information management and provide practitioners with specific contract strategies to improve project information management.
- 1 August 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 148 (8) , 04022075
Recommended Practices for Effective Management of Academia–Industry Collaborative Research Teams in Construction Management
A significant benefit of research collaboration between academia and industry is that it encourages industry to make use of research outcomes produced through the synergy effect between academic and industry participants. Despite these potential benefits, only a limited number of studies have looked at actual cases of such collaboration in the construction management area. To help improve academia–industry collaborative research, the current study validated the success factors collected from extant literature against actual cases. The study conducted in-depth studies of 11 research teams, a mix of well-functioning and subpar-functioning teams. The 11 research teams, whose work was completed between 1988 and 2011, were selected from the research efforts sponsored by the Construction Industry Institute (CII), an organized research unit of the University of Texas at Austin. The case studies of the 11 research teams included semistructured interviews with 39 participants and an analysis of research team documents (e.g., team meeting minutes). The study then identified and analyzed recommended practices linked with the success factors of the collaborative research between academics and industry practitioners. As a result, this study provides a guide to successful academia–industry collaborative research that can enhance the academic body of knowledge as well as industry dissemination and implementation.
- 1 August 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 148 (8) , 04022075
Recommended Practices for Effective Management of Academia–Industry Collaborative Research Teams in Construction Management
A significant benefit of research collaboration between academia and industry is that it encourages industry to make use of research outcomes produced through the synergy effect between academic and industry participants. Despite these potential benefits, only a limited number of studies have looked at actual cases of such collaboration in the construction management area. To help improve academia–industry collaborative research, the current study validated the success factors collected from extant literature against actual cases. The study conducted in-depth studies of 11 research teams, a mix of well-functioning and subpar-functioning teams. The 11 research teams, whose work was completed between 1988 and 2011, were selected from the research efforts sponsored by the Construction Industry Institute (CII), an organized research unit of the University of Texas at Austin. The case studies of the 11 research teams included semistructured interviews with 39 participants and an analysis of research team documents (e.g., team meeting minutes). The study then identified and analyzed recommended practices linked with the success factors of the collaborative research between academics and industry practitioners. As a result, this study provides a guide to successful academia–industry collaborative research that can enhance the academic body of knowledge as well as industry dissemination and implementation.
- 30 May 2022
- Published by Springer Nature
- p. 263-272
Association of BIM-Related Contract Language and BIM Use on Construction Projects
- 30 May 2022
- Published by Springer Nature
- p. 263-272
Association of BIM-Related Contract Language and BIM Use on Construction Projects
- 1 May 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38 (3) , 05022007
A Novel Approach to Capture Similarity in Capital Project Benchmarking: An Application to Healthcare Projects
For credible project benchmarking, like-for-like project comparison is a prerequisite to set realistic targets for improvement, especially when a heterogeneous sample of healthcare projects is compared to another. However, the current method for determining the groups of similar projects relies on an ad-hoc technique that can lead to suboptimal target settings for improvement. To address this issue, this research proposes a novel approach to capture similarity for capital project benchmarking by leveraging Classification and Regression Trees (CART). This research focuses on healthcare projects. The data collected from a total of 89 healthcare projects were used to construct the trees by selecting a set of critical and flexible features that are closely associated with two metrics representing cost and schedule performance of the selected projects. The effectiveness of results derived from the proposed method was validated through statistical methods and comparative analysis. The proposed method allows for more targeted performance comparisons by capturing similarity using flexible sets of meaningful features, which reduces the search space of determining a group of similar projects. The new approach is, thus, expected to help organizations gain better insights into their relative performance position when benchmarking their capital projects.
- 1 May 2022
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 38 (3) , 05022007
A Novel Approach to Capture Similarity in Capital Project Benchmarking: An Application to Healthcare Projects
For credible project benchmarking, like-for-like project comparison is a prerequisite to set realistic targets for improvement, especially when a heterogeneous sample of healthcare projects is compared to another. However, the current method for determining the groups of similar projects relies on an ad-hoc technique that can lead to suboptimal target settings for improvement. To address this issue, this research proposes a novel approach to capture similarity for capital project benchmarking by leveraging Classification and Regression Trees (CART). This research focuses on healthcare projects. The data collected from a total of 89 healthcare projects were used to construct the trees by selecting a set of critical and flexible features that are closely associated with two metrics representing cost and schedule performance of the selected projects. The effectiveness of results derived from the proposed method was validated through statistical methods and comparative analysis. The proposed method allows for more targeted performance comparisons by capturing similarity using flexible sets of meaningful features, which reduces the search space of determining a group of similar projects. The new approach is, thus, expected to help organizations gain better insights into their relative performance position when benchmarking their capital projects.
- 7 March 2022
- Published by American Society of Civil Engineers (ASCE)
- p. 40-48
Construction Industry Institute’s Impact on Construction Engineering and Management Academic Publications
The Construction Industry Institute (CII) is a research and development organization that focuses on the capital projects industry. With over 38 years of research, CII is a leader in the construction engineering and management (CEM) field. The objective of this research was to evaluate the impact of CII’s research publications on recent construction engineering and management academic publications. Researchers utilized Google Scholar to identify academic publications that cited CII. Data were collected for the time range between August 2018 and August 2021, yielding a dataset of 354 academic publications and over 500 citations to CII research publications. Analysis identified “Constructability: A Primer” as the most frequently cited research publication in this dataset. Additionally, front end planning, constructability, and planning for modularization were the top cited CII Best Practices. These findings indicate the popularity of the front end planning and constructability best practices among CII’s research publications. In addition to identifying the most frequently cited publications and best practices, there was also a gap with respect to publication citations related to strong areas of interest from the industry, such as advanced work packaging (AWP) and technology. These gaps identify some of the many opportunities for future research and development within the capital projects industry. Overall, CII’s research has disseminated into broader CEM research and their future-looking research outlook drives the capital projects industry forward as it tackles more uncertainty and new challenges.
- 7 March 2022
- Published by American Society of Civil Engineers (ASCE)
- p. 40-48
Construction Industry Institute’s Impact on Construction Engineering and Management Academic Publications
The Construction Industry Institute (CII) is a research and development organization that focuses on the capital projects industry. With over 38 years of research, CII is a leader in the construction engineering and management (CEM) field. The objective of this research was to evaluate the impact of CII’s research publications on recent construction engineering and management academic publications. Researchers utilized Google Scholar to identify academic publications that cited CII. Data were collected for the time range between August 2018 and August 2021, yielding a dataset of 354 academic publications and over 500 citations to CII research publications. Analysis identified “Constructability: A Primer” as the most frequently cited research publication in this dataset. Additionally, front end planning, constructability, and planning for modularization were the top cited CII Best Practices. These findings indicate the popularity of the front end planning and constructability best practices among CII’s research publications. In addition to identifying the most frequently cited publications and best practices, there was also a gap with respect to publication citations related to strong areas of interest from the industry, such as advanced work packaging (AWP) and technology. These gaps identify some of the many opportunities for future research and development within the capital projects industry. Overall, CII’s research has disseminated into broader CEM research and their future-looking research outlook drives the capital projects industry forward as it tackles more uncertainty and new challenges.
- 7 March 2022
- Published by American Society of Civil Engineers (ASCE)
- p. 69-78
Longitudinal Study of Information Management in University Construction Contracts
Information management (IM) is a critical component to projects in the architecture, engineering, and construction industry. A defined IM process can improve a project’s lifecycle, from project delivery to operations and maintenance. Typically, owners are the project stakeholders that can benefit the most from having a defined IM process as having current, relevant, and accurate information can improve decision-making and overall project performance. To this end, a longitudinal study of university construction contract documents with respect to IM was carried out. The focus was on universities as they are owners and operators who have a vested interest in their project’s lifecycle. Researchers evaluated contract documents comprised of the construction manager at risk (CMAR) agreement and the general conditions document for one university system and these documents span 2002–2019. Three versions of the CMAR agreement and three versions of the general conditions documents were analyzed and compared using qualitative analysis and coding. The main areas of analysis were information transactions, IM systems, and legal factors impacting IM. Results of this analysis show that as new IM processes, such as building information modeling, were adopted in the organization, more specific language regarding the process of IM were included in the contract documents. These findings illustrate how IM has evolved over time in university contracts between owners and contractors.
- 7 March 2022
- Published by American Society of Civil Engineers (ASCE)
- p. 69-78
Longitudinal Study of Information Management in University Construction Contracts
Information management (IM) is a critical component to projects in the architecture, engineering, and construction industry. A defined IM process can improve a project’s lifecycle, from project delivery to operations and maintenance. Typically, owners are the project stakeholders that can benefit the most from having a defined IM process as having current, relevant, and accurate information can improve decision-making and overall project performance. To this end, a longitudinal study of university construction contract documents with respect to IM was carried out. The focus was on universities as they are owners and operators who have a vested interest in their project’s lifecycle. Researchers evaluated contract documents comprised of the construction manager at risk (CMAR) agreement and the general conditions document for one university system and these documents span 2002–2019. Three versions of the CMAR agreement and three versions of the general conditions documents were analyzed and compared using qualitative analysis and coding. The main areas of analysis were information transactions, IM systems, and legal factors impacting IM. Results of this analysis show that as new IM processes, such as building information modeling, were adopted in the organization, more specific language regarding the process of IM were included in the contract documents. These findings illustrate how IM has evolved over time in university contracts between owners and contractors.
- 1 November 2021
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 13 (4) , 04521022
Identification and Ranking of Legal Factors Impacting Information Management in the AEC Industry Using the Delphi Method
Information management is a critical aspect of project delivery in the architecture, engineering, and construction (AEC) industry. Previous studies have identified legal factors as an integral part of developing and implementing information management processes, but there is a need to study these factors in the AEC project context. The objective of this research was to identify and prioritize legal factors impacting information management in the AEC industry in the context of vertical construction projects delivered using design/bid/build. Researchers implemented the Delphi method to identify and prioritize these legal factors impacting information management. First, researchers assembled an expert panel of AEC industry practitioners. Next, a literature review was completed to develop an introductory survey that served to solicit additional factors from the expert panel and to confirm the expert panel’s qualifications. Three rounds of Delphi surveys were administered to score and rank 15 factors impacting information management. Experts were asked to consider a vertical construction project delivered using design/bid/build when ranking factors in order to promote consistency. The results indicated that risk allocation in contracts, data translation, and information preservation were the top-ranked factors. The findings of this study can serve as a guide for practitioners when developing and implementing information management processes. Furthermore, these findings contribute to the body of knowledge by identifying and prioritizing legal factors that impact information management in vertical construction projects delivered using the design/bid/build delivery method.
- 1 November 2021
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 13 (4) , 04521022
Identification and Ranking of Legal Factors Impacting Information Management in the AEC Industry Using the Delphi Method
Information management is a critical aspect of project delivery in the architecture, engineering, and construction (AEC) industry. Previous studies have identified legal factors as an integral part of developing and implementing information management processes, but there is a need to study these factors in the AEC project context. The objective of this research was to identify and prioritize legal factors impacting information management in the AEC industry in the context of vertical construction projects delivered using design/bid/build. Researchers implemented the Delphi method to identify and prioritize these legal factors impacting information management. First, researchers assembled an expert panel of AEC industry practitioners. Next, a literature review was completed to develop an introductory survey that served to solicit additional factors from the expert panel and to confirm the expert panel’s qualifications. Three rounds of Delphi surveys were administered to score and rank 15 factors impacting information management. Experts were asked to consider a vertical construction project delivered using design/bid/build when ranking factors in order to promote consistency. The results indicated that risk allocation in contracts, data translation, and information preservation were the top-ranked factors. The findings of this study can serve as a guide for practitioners when developing and implementing information management processes. Furthermore, these findings contribute to the body of knowledge by identifying and prioritizing legal factors that impact information management in vertical construction projects delivered using the design/bid/build delivery method.