Types
Company, Funder
Locations
Stavanger, Norway
Relationships

Latest Publications

  • Extending Service Life of the Statpipe Pipeline Systems in the Norwegian North Sea While Properly Managing Seawater Usage and Reducing CO2 Emissions

    by E. J. Tovar, A. O. Orozco, D. Galasso, A. Guy, J. Backlund, A. Groven, S. Aanesen, M. Ghorbaniyan, S. Haruna

    Statpipe pipeline systems have been transporting rich and dry gas from several fields in the Norwegian North Sea to the Kårstø gas processing plant since 1985. To extend its service life, a new landfall solution was developed, consisting of a subsea tunnel for landing the existing pipelines with new pipelines in the landing tunnel on the seabed, connecting to a valve station onshore. This paper reviews the job sequence to make this operation successful. The complex operations included decommissioning of the existing 28-in. and 30-in. pipelines, their mechanical isolation, cutting and tie-in to the new pipelines both subsea and onshore, and pre-commissioning and commissioning jobs in the novel pipeline systems. The process involved, in some cases, simultaneous land and offshore activities, and the utilization of a substantial amount of seawater flowing through the pipelines to be discharged to sea. One main challenge was supply and management of such large quantities of water and its post-treatment making it acceptable for discharge at this shoreline location, imposing very strict discharge limits (0.001mg/L) on Hg and Pb. More than 20,000m3 of contaminated seawater was successfully filtered by a 7000m2 0.1micron ultra filtration unit, allowing all particulate matter to be removed which included ‘Black Dust’ particles, and other contaminants (such as mercury and lead), permitting a safe discharge into the open sea near shore. This amount of seawater, equivalent to approximately seven Olympic swimming pools was handled on the fly, assisted by some significant buffer volumes. This novel solution prevented potential project delays and mitigated subsequent economic and environmental impacts, such as CO2 emissions. The consequences of unsuccessful water treatment would have been very significant and resulted in substantial time delays, cost impact and C02 emissions. Utilizing this high-capacity ultra filtration unit for the first time in this application, the Statpipe systems with 28-in. and 30-in. pipelines were successfully commissioned, enabling hydrocarbon transport, improving operational efficiency, and extending the service life until 2050 as planned. This paper will discuss how intercompany collaboration, good communication, and engineered solutions enabled the safe and successful execution of a complex project with several operations. The project aimed to extend the lifetime of one of the most important pipeline systems in Norway, which transports hydrocarbons to Europe, while providing sustainable solutions.

  • Breaking the Limits: How Wireline Solutions Conquered a Unique Coiled Tubing Fishing Challenge

    by Matthew Warren Powell, Nenad Malenovic, Lars Rune Moberg, Vegard Haugstvedt

    Executive Summary: This paper presents an unconventional fishing challenge involving over one kilometer of coiled tubing with a spun-open spiral top, left in the well after unsuccessful coiled-tubing intervention. No conventional solutions or existing technologies could address this condition, partly due to ID restrictions higher up In the wellbore. The objective was to engineer and execute electric-line (e-line) solutions to recover the spiral top and prepare the coiled tubing with a clean top of fish, suitable for future operations. Three power mechanical solutions were developed and validated through extensive onshore system integration testing, using full-scale spiral replicas. The Extra Slim Power Mechanical Cutter was designed to pass through the spun open spiral top, enter the coiled tubing internal diameter, and perform a controlled cut of the damaged section. The Intelligent Electrical Fishing Tool, fitted with newly developed multi-finger claws and surface readout, gripped and retrieved the spiral top despite severe minimum-ID restrictions. Finally, a specialized coiled-tubing milling bit was engineered to dress the remaining fish. Onshore testing confirmed suitability and optimized the sequencing, however the mill bit run was unsuccessful due to the residual bend of the coiled tubing fish. All engineered equipment was mobilized along with a narrow decision tree and procedures derived from onshore testing. The Extra Slim Power Mechanical Cutter executed the planned cutting sequence, confirmed by a downhole camera run. Although the cut occurred at the lowest point of the coiled tubing spiral, it effectively weakened and separated the spiral fish top. The Intelligent Electrical Fishing Tool then positively engaged the spiral top, verified by surface indication of finger position, and retrieved it to surface—successfully passing severe minimum-ID restrictions and hang-up points using controlled stroker force when required. The operation was resolved using uniquely engineered solutions, demonstrating the technical feasibility of wireline-based fishing in extreme and unconventional conditions. Key observations emphasized tool adaptability, integrated surface readout, precise sequencing, and rigorous pre-job testing to ensure successful outcome. This approach reduced operational complexity, offering reduced footprint intervention. Conclusions confirm that innovative e-line solutions can resolve complex fishing challenges, lower CO2 emissions, and more agile rigging compared to traditional coiled-tubing operations. This case study demonstrates how advanced e-line mechanical solutions can assist large-scale fishing and coiled-tubing operations by dressing top of fish and thus enabling future fishing operations. It shows that customized engineering, supported by extensive onshore testing and careful operational planning, significantly mitigates risk in complex fishing challenges. The methodology highlights the value of engineering innovation, integrated surface-readout technology, and rigorous testing in delivering safe, efficient, and cost-effective interventions under extreme well conditions.

  • Integrated Well Intervention Strategies for Inverted Gas Lift System (IGLS) Retrieval and Pre-P&A Preparation: A Case Study in Planning and Execution Using Wireline, Rig, and Coiled Tubing from the North Sea

    by M. Afsari, A. Pando, B. C. Anene, S. Grundnes-Tjøtta, M. King, H. Kettle, N. Duarte

    The Statfjord field, located in the North Sea on the Norwegian Continental Shelf (NCS), is one of the oldest producing fields operated by Equinor. Discovered in 1974 and brought into production in 1979, The field comprises three platforms—Statfjord A, B, and C—each contributing to decades of sustained hydrocarbon production. As the field matures, Equinor has implemented various strategies to extend the productive life of its wells. Among these, the Coiled Tubing Inverted Gas Lift System (IGLS) has emerged as a retrofit solution to rejuvenate declining wells. IGLS enables gas lift through coiled tubing, offering a flexible and efficient alternative to conventional gas lift systems. Two wells in Statfjord A platform were equipped with IGLS systems during earlier rejuvenation campaigns in 2014. With the onset of permanent plug and abandonment (P&A) campaigns across the Statfjord A platform, the need to retrieve IGLS strings from selected wells has become critical. The operation represented a first-of-its-kind execution within this field, introducing new technical workflows and requiring precise coordination across multiple disciplines. This paper provides a comprehensive overview of the IGLS completion string retrieval and pre-P&A campaign, covering all critical aspects from concept to execution. It addresses the technical components of the IGLS completion string, evaluates feasibility and concept selection, and outlines the planning strategy adopted for this first-time operation within Equinor Statfjord project. The article details risk management practices, execution methodology, barriers revalidation, operational challenges encountered, and engineered contingencies and solutions implemented on converting a complex production-enhancement retrofit system into a safe P&A-ready well state. It captured throughout wireline, rig-based, and coiled tubing phases covering each operational stage of the two wells included in the campaign. The successful execution of this campaign has laid the foundation for a standardized workflow that can be replicated in future intervention and P&A operations.

  • Foam Cementing with Underbalanced Mud Weight: Changing the Risk Picture and Probability of Success of the Martin Linge Field

    by Roberto Obando, Dag Ove Molde, Sara Sanson, Frode Erstad

    Primary cementing of the 7-in. production liner in the Martin Linge field has historically been challenged by gas-bearing formations in the 8½-in. overburden section, resulting in narrow operational pressure windows and difficulties achieving reliable zonal isolation. Foam cement had previously been qualified as the preferred cementing solution because of its superior gas-migration resistance, reduced hydrostatic pressure and improved zonal isolation compared with conventional cement systems (API, 2010; Mahmoud et al., 2024). However, increasing gas influxes and higher-than-anticipated pore pressures encountered during well A-13A reduced the available operating window to the extent that the qualified foam cement methodology could no longer be safely applied. A conventional Managed Pressure Cementing (MPC) operation was successfully executed instead, but post-job cement evaluation demonstrated significantly poorer cement quality, highlighting the need for an alternative solution (Halliburton, 2025). To overcome this challenge, Equinor established a multidisciplinary engineering team with Halliburton and Weatherford to evaluate whether foam cement could be safely combined with Managed Pressure Cementing while maintaining a statically underbalanced mud weight throughout the cementing operation. A structured qualification programme was undertaken involving hydraulic simulations, laboratory verification, operational procedure development, multidisciplinary technical reviews and formal risk assessments to evaluate the feasibility of the proposed methodology before field implementation. The qualification process followed established engineering principles for technology verification, risk reduction and barrier assurance prior to field deployment (API, 2010). Following completion of the qualification process, the methodology was successfully implemented during cementing of the 7-in. production liner on the Martin Linge field. The bottom-hole pressure was maintained within an operating window of only 0.07 sg equivalent mud weight throughout the operation without losses or well control events. Post-job cement evaluation confirmed competent zonal isolation, validating both the engineering qualification process and the operational methodology (Weatherford, 2025). To the authors' knowledge, this represents the first field application of foam cementing performed while maintaining a statically underbalanced mud weight under Managed Pressure Drilling conditions. Beyond the successful field implementation, this paper demonstrates a systematic engineering approach for qualifying and deploying innovative cementing technologies in wells with extremely narrow pressure margins. The methodology provides a practical framework that may be applicable to other HPHT developments where conventional primary cementing approaches are constrained by gas-bearing formations and limited operational windows.

  • Open Access

    The AWAKEN wind farm benchmark – Part 2: Modeling results

    by Nicola Bodini, Patrick Moriarty, Regis Thedin, Paula Doubrawa, Cristina Archer, Myra Blaylock, Carlo Bottasso, Bruno Carmo, Lawrence Cheung, Camille Dubreuil, et al.

    Accurately modeling wind farm performance in complex atmospheric flows remains a challenge. This paper presents the modeling results of the American WAKE experimeNt (AWAKEN) wind farm benchmark, a collaborative effort involving 16 research groups from academia and industry within the International Energy Agency Wind Technology Collaboration Programme Task 57. The study evaluates a diverse suite of simulation tools, ranging from fast-running engineering wake models to high-fidelity large-eddy simulations, against a diurnal case study observed during the AWAKEN campaign. The benchmark utilized a three-phase structure to progressively assess model performance as observational data availability increased. Initial blind predictions showed that higher-fidelity models did not uniformly outperform simpler simulation tools in terms of aggregate error metrics; however, this largely reflects differences in inflow strategy rather than wake physics fidelity – simpler models directly ingested high-quality observations, while higher-fidelity models were tasked with predicting the inflow from coarser reanalysis boundary conditions. A distinct spatial bias was observed where models struggled to resolve the interplay between a low-level jet, wakes, and terrain-induced flow acceleration. In subsequent phases, access to progressively richer observational data enabled model refinement that reduced mean absolute error by up to 40 %; however, these gains primarily reflect state-conditioned calibration to a well-observed atmospheric state. Overall, the study demonstrates that inflow characterization defines a lower bound on achievable model accuracy that is independent of wake modeling fidelity – a finding with direct implications for pre-construction energy assessment workflows. While the limited ability to resolve local terrain-flow interactions under single-day conditions represents a recognized constraint, the findings on wake modeling and real-world validation still provide valuable guidance for model application and future benchmark design.


  • Open Access

    Beyond the Pareto Front: Interpretable and Uncertainty-Aware Decision Support for Sustainable Subsurface Energy Strategy Selection

    by Auref Rostamian, Enrico Riccardi, Remus G. Hanea, Reidar B. Bratvold

    Subsurface energy development planning requires decision-makers (DMs) to select a single field strategy while balancing economic performance, operational efficiency, and environmental sustainability. Because these objectives mostly conflict, multi-objective optimization approaches generate a Pareto set rather than one optimal strategy. While this set reveals trade-offs, it cannot determine which alternative to implement. This study presents a post-optimization decision-support workflow that translates a Pareto set into a defensible recommendation without replacing the DMs. The workflow preserves preference information, preference uncertainty, and process transparency rather than collapsing them into a single score. It integrates structured preference weighting, uncertainty-aware multi-criteria ranking, rule-based interpretation, and preference-perturbation analysis. The framework is demonstrated using two benchmark subsurface cases with constructed preference scenarios that combine economic, recovery, CO$_2$-emission, and energy-efficiency objectives. In the first case, the preferred strategy remains stable across preference scenarios because the Pareto set contains few alternatives. In the second, a larger candidate set yields different preferred strategies depending on whether economic, recovery, or environmental priorities dominate. Rule-based analysis explains how attribute importance shapes each ranking, while a confidence-factor test quantifies how far preferences can shift before the selected strategy changes. The workflow therefore distinguishes robust recommendations from choices that depend strongly on assumed priorities.

  • Molecular Insights on Competitive Adsorption Characteristics of CO2/CH4/H2S Multicomponent Mixtures in Kaolinite Nanopores

    by Cheng Qian, Zhenhua Rui, Yueliang Liu, Kai Du, Changhong Cao, Tao Yang, Farshid Torabi, Na Liu

    Summary: The sequestration of CO2 in shale formations has dual benefits of reducing carbon emissions and enhanced oil recovery (EOR). CO2 purified from industrial waste gas is the main gas source for CO2 injection into oil reservoirs. Impurity gases in industrial waste gas, such as H2S, may impair carbon storage and gas recovery via competitive adsorption. Consequently, it is worthwhile to evaluate the competitive adsorption characteristics of CO2, CH4, and H2S, and their multicomponent mixtures within kaolinite nanopores, and the implications on carbon sequestration and CH4 recovery. Drawing upon the kaolinite nanopores model, the impact of various surfaces on the adsorption characteristics of CO2, CH4, H2S, and their mixes was examined using the grand canonical Monte Carlo (GCMC) method. Various factors, including temperature (293.15–383.15 K), pressure (0–20 MPa), pore width, and gas mole fraction, are investigated in the adsorption behaviors of the mixtures in the nano-confined space. The quantity of three molecules adsorbed enhances as the pressure grows and decreases with rising temperature. The rank of the absolute adsorbed amount is H2S > CO2 >CH4. The interaction energies of kaolinite with CO2, CH4, and H2S at 20 MPa and 293.15 K are –1,421.1138,–479.0825, and −2,528.245 kcal/mol, respectively, and the van der Waals energy is the main component of the interaction energy. Compared with hydrophobic pores, the loading of H2S, CO2, and CH4 in hydrophilic pores under 323.15 K and 20 MPa is 22.76%, 13.17%, and 11.57% greater, respectively. Three molecules show better adsorption stability on hydrophilic walls. The adsorption capacity of three molecules in binary/ternary mixtures is H2S>CO2>CH4. Gas components are crucial factors affecting the adsorption capacity of each component in multicomponent mixtures. In CO2/H2S and CH4/H2S binary mixtures, the adsorption of CO2 and CH4 is negatively impacted by H2S, and the adsorbed CO2 and CH4 are reduced by roughly 59.66% and 87.11%, respectively, at 25% (molar fraction) H2S. In CO2/H2S/CH4 ternary mixtures, CO2 and H2S exhibit strong competitive adsorption in the vicinity of the pore wall, whereas CH4 is predominantly distributed in the central region of the pore. An increase in H2S content leads to a transition of the three molecules toward lower energy states, facilitating their adsorption in a more stable configuration within the kaolinite nanopores. The nanoscale mechanism of gas adsorption in the clay mineral was disclosed from a molecular perspective, which theoretically supports the application of CO2 storage and EOR projects in shale reservoirs.

  • Ensemble-Based Production Strategy Selection for a Stochastic Gradient Method with Well Number and Priority Control Vectors

    by J. P. Oliveira, V. E. Botechia, A. A. S. Santos, D. J. Schiozer, R. Oliveira, R. March

    Decision-making in uncertain scenarios with a large number of decision variables (i.e., control vectors in mathematical formulations) is complex. Open-source simulation and optimization tools can assist with these decisions. However, establishing guidelines is important to reduce computational demand, prevent suboptimal decisions, and, consequently, improve oil recovery and economic return. This work aims to define a practical procedure for tuning the parameters of the optimization algorithm and selecting an ensemble-based production strategy for a stochastic gradient method with decision variables of well number and priority. The number of simulation runs, the stochasticity of the optimization algorithm, and the performance of the procedure are also analyzed during the evaluation. We consider reservoir, geological, operational and economic uncertainties using an ensemble of simulation models and economic scenarios from a public-access synthetic reservoir benchmark case featuring Brazilian sandstone (named UNISIM-I-D). We reparametrized the optimization algorithm (named Stochastic Simplex Approximate Gradient (StoSAG)), which is formulated for continuous variables (e.g., well production and injection rates), for commonly used discrete and binary variables. Consequently, we adapted the well priority for well placement selection, defining candidate well's positions with a quality map and ranking wells at the start of the process based on the Well Economic Indicator (WEI). The well number and priority decision variables are optimized simultaneously using the robust ensemble-based optimization approach. The optimization algorithm's parameters (i.e., initial guess, perturbation number, and perturbation magnitude) are tuned using an 8-step assisted procedure subdivided into two decisions. During robust ensemble-based optimization, the Objective Function (OF) is the Expected Field Economic Indicator (EFEI). The results indicate that there is an inverse behavior between the perturbation magnitude and the approximate gradient, provided that both control vectors are tuned in the same direction (ascending or descending) and the other parameters are kept, which is useful for tuning parameters. The optimal strategy achieves a 24.9% increase in economic return compared to the worst strategy. These strategies are obtained only during the 2nd decision, which considers the complete optimization process. Thus, this decision-making procedure is useful for avoiding suboptimal production strategy selection caused by an inappropriate parameter setting. In addition, this work establishes guidelines for selecting an ensemble-based production strategy for a stochastic gradient-based technique with well number and priority decision variables, which also allows: (1) selecting well placement based on well priority, (2) reducing computational demand by proposing steps for setting parameters, (3) improving decision accuracy during oilfield development and management, (4) providing insights that can be applied to a variety of problems (e.g., model-based production strategy selection, other decision variables), and (5) automating processes.

  • Bayesian Seismic Inversion Meets History Matching: Rock Facies Modeling for CO2 Storage with 4D Seismic Constraints

    by J. Romero, R. Hanea, L. Hustoft, X. Luo, S. Riordan, A. Adedamola, W. Heidrich, M. Ravasi

    Summary: Accurate reservoir characterization is crucial for ensuring the long-term security of geological carbon dioxide (CO2) storage. While assisted history matching (AHM) with 4D seismic data is a key technology for reducing geological uncertainty, conventional workflows often oversimplify the inherent uncertainty in the seismic observations, potentially biasing the results. In this paper, we introduce an integrated AHM framework that accounts for seismic data uncertainty to produce more reliable geological models. The workflow leverages Bayesian seismic inversion to obtain a probabilistic estimate of the 4D acoustic impedance change and its associated uncertainty. These probabilistic data are then assimilated via the ensemble smoother with multiple data assimilation (ES-MDA) algorithm, with the goal of updating the parameters of the underlying geological facies model. The proposed methodology is successfully applied to a reservoir interval of the Sleipner CO2 storage site, using 4D seismic data from the 2016 and 2020 vintages. The history-matched posterior facies models show the emergence of a north/south sandstone facies trend system, interpreted as local channel features. This update leads to an improvement in the match between the synthetic and observed seismic data and a reduction in geological uncertainty. Our findings demonstrate that the probabilistic treatment of seismic data in AHM can lead to more geologically plausible reservoir models and therefore more trustworthy forecasts, representing a significant step toward more robust risk management for industrial-scale CO2 storage projects.

  • Temperatures of oil expulsion from source rocks: evidence from oil inclusions in diagenetic cements in North Sea sandstones

    by Olav Walderhaug

    The temperature of oil expulsion from source rocks is one of the central questions of petroleum geology. Many differing opinions regarding what this temperature or temperature range may be are presented in the literature, and a consensus has not been reached. The present study addresses the topic through detailed petrographic investigation of oil inclusions trapped in carbonate cements, in the dust rims beneath quartz overgrowths, and in albitized plagioclase in the quartzose reservoir sandstones of the Norwegian sector of the North Sea. Previous studies show that the temperature of albitization in the area is approximately 88°C, and that quartz overgrowths start forming at around 80°C. Moreover, pervasive carbonate cement enclosing quartz grains without quartz overgrowths must have formed at temperatures less than the temperature of initial quartz cementation. Regardless of burial depth, most of the studied reservoirs currently filled by oil or wet gas contain oil inclusions in one, two, or all three of the mentioned diagenetic cements where formation temperature is high enough for such cements to be present. This clearly suggests that the temperature of oil filling in North Sea reservoirs is normally less than 80–90°C. Reservoir temperatures of less than 80–90°C were commonly reached in Cretaceous times when the study area’s Upper Jurassic source rocks were not deeply buried, implying temperatures of oil expulsion less than 100°C, possibly considerably less. Also, some of the studied oil-filled sandstones are encased in the Upper Jurassic source rocks, indicating little difference between temperatures of oil expulsion and temperatures of oil filling. The presence of oil inclusions in pre-quartz overgrowth calcite and dolomite cements or in the dust rims beneath quartz overgrowths in almost all these intra-source-rock reservoirs therefore suggests oil expulsion at not more than 80°C. The oil-inclusion data from the North Sea thus point to oil expulsion from source rocks being essentially complete at temperatures of 80–100°C, and the available evidence does not exclude lower expulsion temperatures. This further suggests that oil expulsion has taken place earlier and over a much larger area than normally assumed, and that the need for long-distance oil migration has been exaggerated. It seems reasonable to infer that this will also apply to many other basins.