Foam Cementing with Underbalanced Mud Weight: Changing the Risk Picture and Probability of Success of the Martin Linge Field

Authors:

Abstract
Primary cementing of the 7-in. production liner in the Martin Linge field has historically been challenged by gas-bearing formations in the 8½-in. overburden section, resulting in narrow operational pressure windows and difficulties achieving reliable zonal isolation. Foam cement had previously been qualified as the preferred cementing solution because of its superior gas-migration resistance, reduced hydrostatic pressure and improved zonal isolation compared with conventional cement systems (API, 2010; Mahmoud et al., 2024). However, increasing gas influxes and higher-than-anticipated pore pressures encountered during well A-13A reduced the available operating window to the extent that the qualified foam cement methodology could no longer be safely applied. A conventional Managed Pressure Cementing (MPC) operation was successfully executed instead, but post-job cement evaluation demonstrated significantly poorer cement quality, highlighting the need for an alternative solution (Halliburton, 2025). To overcome this challenge, Equinor established a multidisciplinary engineering team with Halliburton and Weatherford to evaluate whether foam cement could be safely combined with Managed Pressure Cementing while maintaining a statically underbalanced mud weight throughout the cementing operation. A structured qualification programme was undertaken involving hydraulic simulations, laboratory verification, operational procedure development, multidisciplinary technical reviews and formal risk assessments to evaluate the feasibility of the proposed methodology before field implementation. The qualification process followed established engineering principles for technology verification, risk reduction and barrier assurance prior to field deployment (API, 2010). Following completion of the qualification process, the methodology was successfully implemented during cementing of the 7-in. production liner on the Martin Linge field. The bottom-hole pressure was maintained within an operating window of only 0.07 sg equivalent mud weight throughout the operation without losses or well control events. Post-job cement evaluation confirmed competent zonal isolation, validating both the engineering qualification process and the operational methodology (Weatherford, 2025). To the authors' knowledge, this represents the first field application of foam cementing performed while maintaining a statically underbalanced mud weight under Managed Pressure Drilling conditions. Beyond the successful field implementation, this paper demonstrates a systematic engineering approach for qualifying and deploying innovative cementing technologies in wells with extremely narrow pressure margins. The methodology provides a practical framework that may be applicable to other HPHT developments where conventional primary cementing approaches are constrained by gas-bearing formations and limited operational windows.