Development of an Algorithm for Crane Trajectory Distance Calculation for Erection of Precast Concrete Members
Open Access
Abstract
Reducing the construction time for large logistics buildings can result in reduced construction management costs and economic gains from early operation. A large logistics building with a heavy load and long spans was constructed as a precast concrete (PC) structure, which required the use of a sizable crane to lift heavy PC members. A basic analytical approach was employed to resolve potential errors in the planning of PC member erection and to build a systematic erection plan. Calculation techniques for the trajectory distance that use the crane location were applied to select an erection plan that minimizes crane work. A crane trajectory distance calculation algorithm for sustainable PC member erection in large logistics buildings with heavy loads and long spans has been developed. The developed model aids in creating simulation and optimization models to ensure the minimal usage of cranes in the future and in determining the cost, construction time, CO2 emissions, and energy use for each erection plan.Keywords
All Related Versions
Funding Information
- National Research Foundation of Korea (2021R1C1C2094527)
This publication has 45 references indexed in Scilit:
- A fast path planning method for single and dual crane erectionsAutomation in Construction, 2012
- In-situ Production Analysis of Composite Precast Concrete Members of Green FrameJournal of the Korea Institute of Building Construction, 2011
- Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programmingAutomation in Construction, 2011
- An algorithm for the calculation of feasible mobile crane position areasAutomation in Construction, 2011
- A Case Study of the Improvement of the Structural Work of a Logistics Facility by Using PC MemberJournal of the Korea Institute of Building Construction, 2010
- Joints in Concrete Construction2008
- Planning and visualization for automated robotic crane erection processes in constructionAutomation in Construction, 2006
- Innovative 3D‐modelling for selecting and locating mobile cranesEngineering, Construction and Architectural Management, 2004
- Automated Path Planning for Mobile Crane LiftsComputer-Aided Civil and Infrastructure Engineering, 2002
- An algorithm for mobile crane selection and location on construction sitesConstruction Innovation, 2001