Systematic Layout Planning to Improve Facility Layout in Small and Medium Food Enterprise
Open Access
- 27 August 2024
- journal article
- Published by Universitas Airlangga in Southeast Asian Business Review
- Vol. 2 (2) , 111-117
Abstract
The absence of a structured method for revamping current or introducing new production layouts in small and medium-sized enterprises may hinder the flexibility and competitiveness of the enterprise. This study aimed to assess the existing production layout and offer improvement recommendations for a small and medium-sized food enterprise in East Java, Indonesia. Data was obtained through interviews with the owner and observation at the production site. The research employed systematic layout planning, utilizing activity relationship charts and diagrams. The findings presented two alternative suggestions for the production facility layout, with the study recommending the second alternative based on an evaluation of criteria. The second proposed alternative exhibited a total material handling distance per week of 1,812 and a total material handling cost of 17,961.96 rupiah, lower than the first proposed alternative. The managerial implications of this study pertain to the construction of facilities with a focus on technical and hygiene requirements, the design and layout of buildings and rooms, and the requirements for machinery, equipment, and transportation to ensure product quality and safety.Keywords
This publication has 10 references indexed in Scilit:
- Manufacturing Plant Layout Improvement: Case study of a High-Temperature Heat Treatment Tooling Manufacturer in Northeast IndianaProcedia Manufacturing, 2021
- Layout improvement of railway workshop using systematic layout planning (SLP) – A case studyMaterials Today: Proceedings, 2021
- FACILITY LAYOUT PLANNING IN SMALL INDUSTRY TO INCREASE EFFICIENCY (CASE STUDY: BIG BOY BAKERY, BATAM, KEPULAUAN RIAU, INDONESIA)Journal of Industrial Engineering Management, 2020
- BIM-based framework for temporary facility layout planning in construction siteConstruction Innovation, 2019
- A Learning Factory concept for skills enhancement in rail car manufacturing industriesProcedia Manufacturing, 2019
- Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approachCogent Engineering, 2019
- Energy Management in a Manufacturing Industry through Layout DesignProcedia Manufacturing, 2017
- Productivity improvement of a manufacturing facility using systematic layout planningCogent Engineering, 2016
- Layout performance indicators and systematic planningBritish Food Journal, 2015
- Production Layout Optimization for Small and Medium Scale Food IndustryProcedia CIRP, 2015