Balancing U-shaped assembly lines with resource dependent task times: A Simulated Annealing approach
Authors:
- Sachin JayaswalSJSachin Jayaswal
- Prashant AgarwalPAPrashant Agarwal
- 1 October 2014
- journal article
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 33 (4) , 522-534
Abstract
No abstract availableKeywords
All Related Versions
This publication has 28 references indexed in Scilit:
- Two-sided U-type assembly line balancing problemInternational Journal of Production Research, 2011
- Balancing assembly line with skilled and unskilled workersOmega, 2008
- A survey on problems and methods in generalized assembly line balancingEuropean Journal of Operational Research, 2006
- U-shaped assembly line layouts and their impact on labor productivity: An experimental studyEuropean Journal of Operational Research, 2004
- Balancing of U-type assembly systems using simulated annealingInternational Journal of Production Research, 2001
- Design of flexible assembly line to minimize equipment costIIE Transactions, 2000
- The effect of straight- and U-shaped lines on qualityIEEE Transactions on Engineering Management, 2000
- Some experiments with simulated annealing techniques for packing problemsEuropean Journal of Operational Research, 1993
- An improved annealing scheme for the QAPEuropean Journal of Operational Research, 1990
- Some experiments with simulated annealing for coloring graphsEuropean Journal of Operational Research, 1987