Status of the SPIRAL2 injector commissioning
- 30 November 2015
- journal article
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 87 (2) , 02A733
Abstract
The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.Keywords
This publication has 4 references indexed in Scilit:
- Metallic beam developments for the SPIRAL 2 projectReview of Scientific Instruments, 2014
- First plasma of the A-PHOENIX electron cyclotron resonance ion sourceReview of Scientific Instruments, 2008
- BETSI, a new test bench for ion sources optimization at CEA SACLAYReview of Scientific Instruments, 2008
- Status and new developments of the high intensity electron cyclotron resonance source light ion continuous wave, and pulsed mode (invited)Review of Scientific Instruments, 2000