Lateness in production systems - In a nutshell: How to determine the causes of lateness at work systems?
Authors:
- Alexander MützeAMAlexander Mütze
- Tobias HillerTHTobias Hiller
- Peter NyhuisPNPeter Nyhuis
Open Access
- 7 November 2023
- journal article
- research article
- Published by Elsevier in Advances in Industrial and Manufacturing Engineering
- Vol. 8
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- A manufacturing control modelInternational Journal of Production Research, 2012
- A framework for diagnosing the delivery reliability performance of make-to-order companiesInternational Journal of Production Research, 2012
- Three decades of workload control research: a systematic review of the literatureInternational Journal of Production Research, 2011
- Exploring due date reliability in production systems using data mining methods adapted from gene expression analysisCIRP Annals, 2011
- The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companiesInternational Journal of Production Economics, 2008
- Performance measures and metrics in logistics and supply chain management: a review of recent literature (1995–2004) for research and applicationsInternational Journal of Production Research, 2007
- Logistic Production Operating Curves – Basic Model of the Theory of Logistic Operating CurvesCIRP Annals, 2006
- A review and analysis of supply chain operations reference (SCOR) modelSupply Chain Management: An International Journal, 2004
- Logistic Analysis of Production Processes by Operating CurvesCIRP Annals, 1991
- The Throughput Diagram — An Universal Model for the Illustration, Control and Supervision of Logistic ProcessesCIRP Annals, 1988