Incorporating outsourcing, stochastic failure, and scrap into batch fabrication planning
Authors:
- Yuan-Shyi Peter ChiuYCYuan-Shyi Peter Chiu
- Jia-Hang JhanJJJia-Hang Jhan
- Victoria ChiuVCVictoria Chiu
- Chung-Li ChouCCChung-Li Chou
Open Access
- 1 December 2020
- journal article
- research article
- Published by Elsevier in Alexandria Engineering Journal
- Vol. 59 (6) , 5273-5284
Abstract
No abstract availableKeywords
Funding Information
- Ministry of Science and Technology, Taiwan
This publication has 27 references indexed in Scilit:
- Outsourcing through competition: What is the best competition parameter?International Journal of Production Economics, 2013
- Maximising profits for an EPQ model with unreliable machine and rework of random defective itemsInternational Journal of Systems Science, 2013
- A multi-stage production-inventory model with learning and forgetting effects, rework and scrapComputers & Industrial Engineering, 2013
- A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying itemsInternational Journal of Production Research, 2009
- Complementarity, capabilities, and the boundaries of the firm: the impact of within‐firm and interfirm expertise on concurrent sourcing of complementary componentsStrategic Management Journal, 2009
- Incentive maintenance outsourcing contracts for channel coordination and improvementIIE Transactions, 2006
- Optimal preventive maintenance of a production system with an intermediate bufferEuropean Journal of Operational Research, 2006
- Towards theory building in manufacturing flexibilityInternational Journal of Production Research, 2001
- Optimal inspection sublots for deteriorating batch productionIIE Transactions, 1998
- Event-driven model of unreliable production lines with storageInternational Journal of Production Research, 1988