Predicting external water pressure and cracking of a tunnel lining by measuring water inflow rate
Authors:
- Yuqi TanYTYuqi Tan
- John V. SmithJSJohn V. Smith
- Chun-Qing LiCLChun-Qing Li
- Matthew CurrellMCMatthew Currell
- Yufei WuYWYufei Wu
- 1 January 2018
- journal article
- research article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 71, 115-125
Abstract
No abstract availableKeywords
Funding Information
- Metro Trains Melbourne, Australia
- Australian Research Council (DP140101547, LP150100413, DP170102211)
This publication has 19 references indexed in Scilit:
- Excavation-induced hydraulic conductivity reduction around a tunnel – Part 2: Verification of proposed method using numerical modelingTunnelling and Underground Space Technology, 2010
- Excavation-induced hydraulic conductivity reduction around a tunnel – Part 1: Guideline for estimate of ground water inflow rateTunnelling and Underground Space Technology, 2010
- Analytical solution for steady-state groundwater inflow into a drained circular tunnel in a semi-infinite aquifer: A revisitTunnelling and Underground Space Technology, 2008
- A semi-analytical method for analyzing the tunnel water inflowTunnelling and Underground Space Technology, 2007
- Permeability and self-healing of cracked concrete as a function of temperature and crack widthCement and Concrete Research, 2003
- Circular tunnel in a semi-infinite aquiferTunnelling and Underground Space Technology, 2003
- Simplified modelling of calcium leaching of concrete in various environmentsMaterials and Structures, 2002
- An Analytical Solution for Steady Flow into a TtonnelGroundwater, 1999
- Prediction of water flow into rock tunnels: an analytical solution assuming an hydraulic conductivity gradientInternational Journal of Rock Mechanics and Mining Sciences, 1993
- Report on the damaging effects of water on tunnels during their working lifeTunnelling and Underground Space Technology, 1991