Minimizing equipment shutdowns in oil and gas campaign maintenance
Authors:
- 29 June 2020
- journal article
- research article
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 72 (7) , 1486-1504
Abstract
This paper considers the problem of scheduling periodic maintenance items for oil and gas plants. Each maintenance item involves various maintenance tasks and may require temporary equipment shutdowns, which are costly and highly disruptive to production. The aim is to minimise equipment shutdowns by grouping maintenance items with similar shutdown requirements into short-term maintenance operations called campaigns. Real plants can involve tens of thousands of maintenance items and thus manually scheduling the campaigns is an extreme challenge. In this paper, we develop a mixed-integer linear programming model for optimally allocating maintenance items to campaigns so that total shutdown cost is minimised. The model incorporates constraints on maintenance deadlines, campaign times, maintenance item suppression and labour hours per campaign. We solve the model for realistic scenarios involving data for Karratha Gas Plant in Western Australia, which is the main processing plant for the massive North West Shelf oil and gas project.Keywords
Funding Information
- Australian Research Council
This publication has 30 references indexed in Scilit:
- Trends in turnaround maintenance planning: literature reviewJournal of Quality in Maintenance Engineering, 2019
- An exact composite lower bound strategy for the resource-constrained project scheduling problemComputers & Operations Research, 2018
- Multi-objective modeling for preventive maintenance scheduling in a multiple production lineJournal of Intelligent Manufacturing, 2013
- Uncertainty Quantification in Gear Remaining Useful Life Prediction Through an Integrated Prognostics MethodIEEE Transactions on Reliability, 2013
- A Neurogenetic approach for the resource-constrained project scheduling problemComputers & Operations Research, 2011
- A survey of variants and extensions of the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2010
- A branch-and-bound algorithm for the resource-constrained project scheduling problemMathematical Methods of Operations Research, 2000
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling ProblemManagement Science, 1992
- Some efficient multi-heuristic procedures for resource-constrained project schedulingEuropean Journal of Operational Research, 1990
- Scheduling subject to resource constraints: classification and complexityDiscrete Applied Mathematics, 1983