Analysis of parts requirements variance for a JIT supply chain
Author:
- 15 January 2004
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 42 (2) , 417-430
Abstract
Metrics used to assess level parts usage for some JIT supply chains are based on the product-unit by product-unit launch of products on the assembly line. However, many automobile assembly plants require parts suppliers to deliver parts to the assembly line by using a constant order cycle, non-constant order quantity framework. The paper proposes metrics that are suited to this parts delivery framework. Through extensive simulation over a wide range of assembly parameter values, it assesses the ability of supplier plants to match assembly requirements at each supply epoch. Among other things, the study finds that the conventional JIT scheduling framework also works well in general under this parts delivery arrangement, but acute parts stockout conditions could sometimes occur. Therefore, managers need to consider this in determining appropriate inventory levels for each part. This will prevent stockouts and reduce supply chain costs.Keywords
This publication has 11 references indexed in Scilit:
- Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysisInternational Journal of Production Research, 1998
- Evaluating sequences for paced, mixed-model assembly lines with JIT component fabricationInternational Journal of Production Research, 1996
- A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly linesInternational Journal of Production Research, 1996
- Heuristics and exact algorithms for solving the Monden problemEuropean Journal of Operational Research, 1996
- Level Schedules for Mixed-Model, Just-in-Time ProcessesManagement Science, 1993
- A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production systemInternational Journal of Production Research, 1992
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”Management Science, 1991
- Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systemsJournal of Operations Management, 1990
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systemsMathematical and Computer Modelling, 1990
- Scheduling mixed-model multi-level just-in-time production systemsInternational Journal of Production Research, 1989