Incorporating Stochastic Lead Times Into the Guaranteed Service Model of Safety Stock Optimization
Authors:
- 1 October 2013
- journal article
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Interfaces
- Vol. 43 (5) , 421-434
Abstract
Effective end-to-end supply chain management and network inventory optimization must account for service levels, demand volatility, lead times, and lead-time variability. Most inventory models incorporate demand variability, but far fewer rigorously account for lead-time variability, particularly in multiechelon supply chain networks. Our research extends the guaranteed service model of safety stock placement to allow random lead times. The main methodological contribution is the creation of closed-form equations for the expected safety stock in the system; this includes a derivation for the early-arrival stock in the system. The main applied contributions are the demonstration of real stochastic lead times in practice and a discussion of how our approach outperforms more traditional heuristics that either ignore lead-time variability or consider the maximum lead time at each stage.Keywords
This publication has 13 references indexed in Scilit:
- TECHNICAL NOTE—Optimizing Strategic Safety Stock Placement in General Acyclic NetworksOperations Research, 2011
- Inventory Optimization at Procter & Gamble: Achieving Real Benefits Through User Adoption of Inventory ToolsInterfaces, 2011
- Improved Base-Stock Approximations for Independent Stochastic Lead Times with Order CrossoverManufacturing & Service Operations Management, 2005
- Supply Chain Design: Safety Stock Placement and Supply Chain Configuration2003
- Optimizing Strategic Safety Stock Placement in Supply ChainsManufacturing & Service Operations Management, 2000
- Order crossover in inventory systemsCommunications in Statistics. Stochastic Models, 1995
- Determining Safety Stock in the Presence of Stochastic Lead Time and DemandManagement Science, 1988
- A Dynamic Inventory Model with Stochastic Lead TimesManagement Science, 1970
- Optimal Policies for a Multi-Echelon Inventory ProblemManagement Science, 1960
- In-Process InventoriesOperations Research, 1958