WAVE OVERTOPPING AT BERM BREAKWATERS IN LINE WITH EUROTOP
Authors:
- 14 December 2012
- journal article
- Published by Coastal Engineering Research Council in Coastal Engineering Proceedings
- Vol. 1 (33)
Abstract
The paper presents the development of a new overtopping formula for berm breakwaters. Overtopping data from hydraulic model tests of berm breakwaters have been gathered and reanalysed in line with the procedure in the EurOtop Manual. The data shows a clear dependency on wave period or wave steepness, which is in contrast to the main conclusion of the CLASH project and the EurOtop Manual for conventional rubble mound breakwaters. The formula is roughly validated on prototype performance.Keywords
This publication has 8 references indexed in Scilit:
- DESIGN AND OPERATION OF THE US WAVE OVERTOPPING SIMULATOR2013
- FLOW DEPTHS AND VELOCITIES AT CREST AND LANDWARD SLOPE OF A DIKE, IN THEORY AND WITH THE WAVE OVERTOPPING SIMULATORCoastal Engineering Proceedings, 2011
- A new formula for front slope recession of berm breakwatersCoastal Engineering, 2010
- Guidance on erosion resistance of inner slopes of dikes from three years of testing with the Wave Overtopping Simulator2010
- Overtopping performance of different armour units for rubble mound breakwatersCoastal Engineering, 2009
- WAVE HEIGHT LIMITS FOR THE STATICALLY STABLE ICELANDIC-TYPE BERM BREAKWATER2007
- Advances in Berm Breakwaters1998
- Influence of the Core Configuration on the Stability of Berm Breakwaters1997