Monitoring Process Mean and Variance with a Single Generally Weighted Moving Average Chart
- 9 May 2012
- journal article
- research article
- Published by Taylor & Francis in Communications in Statistics - Theory and Methods
- Vol. 41 (12) , 2221-2241
Abstract
Two generally weighted moving average (GWMA) charts are usually used concurrently for a simultaneous monitoring of the process mean and process variance. In this article, we propose a new GWMA chart, called the Max-GWMA chart, which uses a single statistic for a simultaneous monitoring of the process mean and variance. The statistic of the Max-GWMA chart is based on the maximum of the absolute values of two GWMA statistics, one for controlling the mean while the other the variance. We show that the Max-GWMA chart outperforms the combined GWMA chart, in terms of the average run length (ARL), standard deviation of the run length (SDRL) and diagnostic abilities performances. The combined GWMA chart consists of two GWMA charts that are run concurrently, one for monitoring the mean and the other the variance.Keywords
This publication has 18 references indexed in Scilit:
- Monitoring the mean of autocorrelated observations with one generally weighted moving average control chartJournal of Statistical Computation and Simulation, 2009
- Generally weighted moving average control charts with fast initial response featuresJournal of Applied Statistics, 2009
- The extended GWMA control chartJournal of Applied Statistics, 2008
- MONITORING AUTOCORRELATED PROCESS MEAN AND VARIANCE USING A GWMA CHART BASED ON RESIDUALSAsia-Pacific Journal of Operational Research, 2008
- Poisson GWMA Control ChartCommunications in Statistics - Simulation and Computation, 2007
- Fast initial response features for EWMA control chartsStatistical Papers, 2005
- The Generally Weighted Moving Average Control Chart for Detecting Small Shifts in the Process MeanQuality Engineering, 2003
- Extended optimal replacement model for deteriorating systemsEuropean Journal of Operational Research, 1999
- A generalized age and block replacement of a system subject to shocksEuropean Journal of Operational Research, 1998
- Optimal number of minimal repairs before replacement of a system subject to shocksNaval Research Logistics (NRL), 1996