Abstract
This report examines the behaviour of an experimental two-storey monolithic construction during the construction of its flat slabs with a formwork system suitable for the application of early striking. The experimental results of the deformations in the slabs are compared with those from the numerical model of the construction. The peculiarities in the findings of the strength characteristics of the concrete used for the monolithic structure in the tests are analysed. Conclusions are made regarding the production of reinforced concrete slabs through formwork systems suitable for early striking from these results and comparisons.