A GEANT4 Simulation Studyof BESIII endcap TOF Upgrade
Authors:
- Ming ShaoMSMing Shao
- Cheng LiCLCheng Li
- Hongfang ChenHCHongfang Chen
Preprint
Abstract
A GEANT4-based Monte-Carlo model is developed to study the performance of Endcap Time-Of-Flight (ETOF) at BESIII. It's found that the multiple scattering effects, mainly from the materials at the MDC endcap, can cause multi-hit on the ETOF's readout cell and significantly influence the timing property of ETOF. Multi-gap Resistive Plate Chamber (MRPC) with a smaller readout cell structure is more suitable for ETOF detector due to significantly reduced multi-hit rate, from 71.5% for currently-used scintillator-based ETOF to 21.8% or 16.7% for MRPC-based ETOF, depending on the readout pad size used. The timing performance of a MRPC ETOF is also improved. These simulation results suggest and guide an ETOF upgrade effort at BESIII.Keywords
All Related Versions
- Version 1, 2012-08-15, ArXiv
- Published version: Chinese Physics C, 37 (9), 096002.
This publication has 5 references indexed in Scilit:
- A prototype MRPC beam test for the BESIII ETOF upgradeChinese Physics C, 2012
- A GEANT4-based simulation model for the BESIII endcap time-of-flight systemNuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2011
- Time calibration for the end cap TOF system of BESIIIChinese Physics C, 2011
- Design and construction of the BESIII detectorNuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2010
- The performance of the TOFr tray in STARNuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2005