Model Verification and Validation of a Cable-Stayed Bridge: Interval-Based Uncertainty Quantification of the Model Parameters
- 1 August 2022
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Bridge Engineering
- Vol. 27 (8) , 04022066
Abstract
In simulating engineering structures, the uncertainty quantification and propagation (UQ&P) of model parameters is of paramount importance for model verification and validation (V&V), the fidelity of which has been proven to have a prominent effect on structural safety assessment and decision making. In this study, the parametric uncertainties due to environmental periodicity were inversely quantified in form of intervals through a V&V framework based on the conjunction of interval response surface method (IRSM) and probability box (P-Box), which is adaptable and efficient for real bridge structures. The uncertainties of temperature were first quantified with P-Box, based on a year’s worth of data obtained from the structural health monitoring (SHM) system of a cable-stayed bridge. Following that, the uncertainties of structural frequencies were quantified through a correlation analysis between temperature and frequencies which were filtered by different techniques. The expressions of IRSM were constructed and verified, with frequencies calculated from them agreeing well with those calculated from the finite-element (FE) model simulation. Thereafter, the interval boundary values of the observed frequencies were obtained by searching the tails of the P-Box bounds, thus providing the target intervals for model validation. The parametric intervals were validated efficiently through a two-step calibration procedure based on monotonic analysis. The result shows that the validated model has a good predictive capacity and could serve as a high-fidelity model for further application, with the parametric uncertainties appropriately considered in the form of intervals.Keywords
This publication has 39 references indexed in Scilit:
- Interval dynamic response analysis of vehicle-bridge interaction system with uncertaintyJournal of Sound and Vibration, 2013
- Imprecise probabilities in engineering analysesMechanical Systems and Signal Processing, 2013
- Corrosion initiation time updating by epistemic uncertainty as an alternative to schedule the first inspection time of pre-stressed concrete vehicular bridge beamsStructure and Infrastructure Engineering, 2013
- Fuzzy finite element model updating of bridges by considering the uncertainty of the measured modal parametersScience China Technological Sciences, 2012
- Mitigating Epistemic Uncertainty in Structural Identification: Case Study for a Long-Span Steel Arch BridgeJournal of Structural Engineering, 2011
- Aleatory or epistemic? Does it matter?Structural Safety, 2009
- Verification and validation benchmarksNuclear Engineering and Design, 2008
- Probabilistic arithmetic. I. Numerical methods for calculating convolutions and dependency boundsInternational Journal of Approximate Reasoning, 1990
- Stress response of rocket motors to environmental thermal loadsJournal of Spacecraft and Rockets, 1986
- Approach to performance and sensitivity multiobjective optimization: The goal attainment methodIEEE Transactions on Automatic Control, 1975