On Track Procession Assignment Problem at the Railway Network Sections
- 15 June 2020
- journal article
- research article
- Published by Pleiades Publishing Ltd in Automation and Remote Control
- Vol. 81 (6) , 967-977
Abstract
We consider the problem of assigning a “track procession,” i.e., the time for railway network maintenance, when train movements are forbidden. The railway network is presented in the form of an undirected multigraph. Movements along this multigraph are carried out with a set of conflict-free subslots, where each “subslot” is a five-tuple of the arrival and departure vertices, number of the edge used for movement, and arrival and departure times. In this work, we construct a mathematical model for carrying out transportations plan with accounting for constraints on time when trains are for departure as well as constraints on arrival time. An optimization problem on time selection for track processions assignment and trains schedule corresponds to a mixed integer linear programming problem with a criteria of the minimization of total time spend by trains in run. An applied implementation of the proposed approach was performed using ILOG CPLEX software. We present the results of a numerical experiment.Keywords
This publication has 12 references indexed in Scilit:
- Scheduling the Two-Way Traffic on a Single-Track Railway with a SidingAutomation and Remote Control, 2018
- An optimization model for integrated planning of railway traffic and network maintenanceTransportation Research Part C: Emerging Technologies, 2017
- Modelling railway freight traffic using the methods of graph theory and combinatorial optimizationAutomation and Remote Control, 2016
- Maintaining tracks and traffic flow at the same timeJournal of Rail Transport Planning & Management, 2013
- Rescheduling rail networks with maintenance disruptions using Problem Space SearchComputers & Operations Research, 2013
- Approximate dynamic programming in transportation and logistics: a unified frameworkEURO Journal on Transportation and Logistics, 2012
- Stochastic improvement of cyclic railway timetablesTransportation Research Part B: Methodological, 2008
- Solving Real-Life Locomotive-Scheduling ProblemsTransportation Science, 2005
- A Survey of Optimization Models for Train Routing and SchedulingTransportation Science, 1998
- Locomotive assignment with heterogeneous consists at CN North AmericaEuropean Journal of Operational Research, 1997