Scheduling to minimize the makespan in large-piece one-of-a-kind production with machine availability constraints
- 1 December 2015
- journal article
- Published by Elsevier in Expert Systems with Applications
- Vol. 42 (23) , 9174-9182
Abstract
No abstract availableKeywords
Funding Information
- Natural Science Foundation of Anhui Province (TSKJ2014B14)
- National Science and Technology (2011ZX02501-005)
This publication has 28 references indexed in Scilit:
- One-of-a-kind productionProduction Planning & Control, 2013
- A combined integer/constraint programming approach to a resource-constrained parallel machine scheduling problem with machine eligibility restrictionsEngineering Optimization, 2010
- An information system for one-of-a-kind productionInternational Journal of Production Research, 2008
- Scheduling two-stage hybrid flow shop with availability constraintsComputers & Operations Research, 2006
- Minimizing the makespan for the flow shop scheduling problem with availability constraintsEuropean Journal of Operational Research, 2004
- Non-preemptive two-machine open shop scheduling with non-availability constraintsMathematical Methods of Operations Research, 2003
- Heuristic algorithms for the two-machine flowshop with limited machine availabilityOmega, 2001
- Two-machine open shop scheduling with an availability constraintOperations Research Letters, 2001
- Complexity results and approximation algorithms for the two machine no-wait flow-shop with limited machine availabilityJournal of the Operational Research Society, 2001
- Minimizing the makespan in the two-machine no-wait flow-shop with limited machine availabilityComputers & Industrial Engineering, 1999