Shewhart Revisited
Authors:
- 10 April 2013
- journal article
- research article
- Published by Taylor & Francis in Sequential Analysis
- Vol. 32 (2) , 230-242
Abstract
The Shewhart control chart was first to monitor an ongoing process and raise an alarm when it appears that the level has changed. We show that the Shewhart chart is optimal for the criterion of maximizing the probability of detecting a change upon its occurrence subject to an average run length to false alarm. It is remarkable, particularly when the change is of moderate size, that Shewhart's procedure is better than cumulative sum (CUSUM). In the multivariate setting, applying the Shewhart procedure to each process separately is suboptimal. We create a generalized Shewhart procedure that is optimal for the aforementioned criterion. The results are illustrated in common settings.Keywords
This publication has 3 references indexed in Scilit:
- Algorithm AS 258: Average Run Lengths for Cumulative Sum SchemesJournal of the Royal Statistical Society Series C: Applied Statistics, 1990
- Optimal Stopping Times for Detecting Changes in DistributionsThe Annals of Statistics, 1986
- Probability maximizing approach to optimal stopping and its application to a disorder problemStochastics, 1980