Multi-Objective Multi-mode Time-Cost Tradeoff modeling in Construction Projects Considering Productivity Improvement
Preprint
Abstract
In today's construction industry, poor performance often arises due to various factors related to time, finances, and quality. These factors frequently lead to project delays and resource losses, particularly in terms of financial resources. This research addresses the Multimode Resource-Constrained Project Scheduling Problem (MRCPSP), a real-world challenge that takes into account the time value of money and project payment planning. In this context, project activities exhibit discrete cost profiles under different execution conditions and can be carried out in multiple ways. This paper aims to achieve two primary objectives: minimizing the net present value of project costs and project completion times while simultaneously improving the project's productivity index. To accomplish this, a mathematical programming model based on certain assumptions is proposed. Several test cases are designed, and they are rigorously evaluated using the methodology outlined in this paper to validate the modeling approach. Recognizing the NP-hard nature of this problem, a multi-objective genetic algorithm capable of solving large-scale instances is developed. Finally, the effectiveness of the proposed solution is assessed by comparing it to the performance of the NSGA-II algorithm using well-established efficiency metrics. Results demonstrate the superior performance of the algorithm introduced in this study.Keywords
All Related Versions
This publication has 60 references indexed in Scilit:
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patternsAnnals of Operations Research, 2023
- Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSPAnnals of Operations Research, 2023
- On the summary measures for the resource-constrained project scheduling problemAnnals of Operations Research, 2023
- A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertaintyAnnals of Operations Research, 2023
- Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy conditionJournal of Industrial Engineering International, 2019
- A hybrid genetic algorithm for operating room schedulingHealth Care Management Science, 2019
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithmsComputing, 2019
- New strategies for stochastic resource-constrained project schedulingJournal of Scheduling, 2017
- Investigating the impact of developer productivity, task interdependence type and communication overhead in a multi-objective optimization approach for software project planningAdvances in Engineering Software, 2016
- A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter searchApplied Mathematics and Computation, 2007