Full-scale experimental investigation of the mechanical characteristics of corroded buried concrete pipes after cured-in-place-pipe rehabilitation
Authors:
- Kangjian YangKYKangjian Yang
- Hongyuan FangHFHongyuan Fang
- Junling BuJBJunling Bu
- Xijun ZhangXZXijun Zhang
- Bin LiBLBin Li
- Xueming DuXDXueming Du
- Zongyuan ZhangZZZongyuan Zhang
- 1 November 2021
- journal article
- research article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 117
Abstract
No abstract availableKeywords
This publication has 30 references indexed in Scilit:
- Measured Load Capacity of Buried Reinforced Concrete PipesACI Structural Journal, 2016
- Large-Diameter Sewer Rehabilitation Using a Fiber-Reinforced Cured-in-Place PipePractice Periodical on Structural Design and Construction, 2015
- Sewer Rehabilitation Using an Ultraviolet-Cured GFR Cured-in-Place PipePractice Periodical on Structural Design and Construction, 2015
- Performance of a cured-in-place pressure pipe liner passing through a pipe section without structural integrityTunnelling and Underground Space Technology, 2014
- A pilot study for retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation of municipal gravity sewersTunnelling and Underground Space Technology, 2014
- Buckling failure numerical analysis of HDPE pipes used for the trenchless rehabilitation of a reinforced concrete sewerEngineering Failure Analysis, 2013
- External corrosion to concrete sewers: a case studyUrban Water Journal, 2012
- Performance of a two-tier geosynthetic reinforced segmental retaining wall under a surcharge load: Full-scale load test and 3D finite element analysisGeotextiles and Geomembranes, 2008
- Numerical modeling of tight fitting flexible liner in damaged sewer under earth loadsTunnelling and Underground Space Technology, 2007
- Ground failure around buried tubesRock Mechanics and Rock Engineering, 1987