A computational study with a new algorithm for the three-machine permutation flow-shop problem with release times
- 1 May 2001
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 130 (3) , 559-575
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- On the complexity of two-machine flowshop problems with due date related objectivesEuropean Journal of Operational Research, 1998
- Minimising makespan in the two-machine flow-shop with release timesJournal of the Operational Research Society, 1998
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problemEuropean Journal of Operational Research, 1997
- Two branch and bound algorithms for the permutation flow shop problemEuropean Journal of Operational Research, 1996
- Some efficient heuristic methods for the flow shop sequencing problemEuropean Journal of Operational Research, 1990
- On Flow Shop Scheduling with Release and Due Dates to Minimize Maximum LatenessJournal of the Operational Research Society, 1983
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- An adaptive branching rule for the permutation flow-shop problemEuropean Journal of Operational Research, 1980
- Some simple scheduling algorithmsNaval Research Logistics Quarterly, 1974
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954