Critical Path Segments Scheduling Technique
- 1 October 2010
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 136 (10) , 1078-1085
Abstract
While the critical path method (CPM) has been useful for scheduling construction projects, years of practice and research have highlighted serious drawbacks that hinder its use as a decision support tool. This paper argues that many of CPM drawbacks stem from the rough level of detail at which the analysis is conducted, where activities’ durations are considered as continuous blocks of time. The paper thus proposes a new critical path segments (CPS) mechanism with a finer level of granularity by decomposing the duration of each activity into separate time segments. Three cases are used to prove the benefits of using separate time segments in avoiding complex network relationships, accurately identifying all critical path fluctuation, better allocation of limited resources, avoiding multiple-calendar problems, and accurate analysis of project delays. The paper discusses the proposed CPS mechanism and comments on several issues related to its calculation complexity, its impact on existing procedures, and fu...Keywords
This publication has 16 references indexed in Scilit:
- Float Allocation Using the Total Risk ApproachJournal of Construction Engineering and Management, 2009
- Delay Analysis under Multiple Baseline UpdatesJournal of Construction Engineering and Management, 2008
- Critical Path Scheduling under Resource Calendar ConstraintsJournal of Construction Engineering and Management, 2008
- Schedule Analysis under the Effect of Resource AllocationJournal of Construction Engineering and Management, 2007
- Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction ProjectsJournal of Construction Engineering and Management, 2006
- Key Constraints Analysis with Integrated Production SchedulerJournal of Construction Engineering and Management, 2005
- Critical Path Method with Multiple CalendarsJournal of Construction Engineering and Management, 2005
- DSM Versus CPM: Issues for Planning Design & Construction Activities2003
- Project Management in Construction: Software Use and Research DirectionsJournal of Construction Engineering and Management, 2001
- Expert System for Construction PlanningJournal of Computing in Civil Engineering, 1987