Abstract
Summary: This paper provides guidelines to assess the productivity of horizontal-well completions by drilling multiple drainholes or by stimulation with vertical fractures. The paper also offers reliable methods to compute productivity gains for realistic conditions.
Keywords

This publication has 17 references indexed in Scilit: