Productivity of Multiple Drainholes or Fractured Horizontal Wells
- 1 March 1993
- journal article
- Published by Society of Petroleum Engineers (SPE) in SPE Formation Evaluation
- Vol. 8 (01) , 11-16
Abstract
Summary: This paper provides guidelines to assess the productivity of horizontal-well completions by drilling multiple drainholes or by stimulation with vertical fractures. The paper also offers reliable methods to compute productivity gains for realistic conditions.Keywords
This publication has 17 references indexed in Scilit:
- New Solutions for Well-Test-Analysis Problems: Part 1—Analytical ConsiderationsSPE Formation Evaluation, 1991
- A Parametric Comparison of Horizontal and Vertical Well PerformanceSPE Formation Evaluation, 1991
- Fracturing Aspects of Horizontal WellsJournal of Petroleum Technology, 1990
- Horizontal-Well Pressure AnalysisSPE Formation Evaluation, 1989
- Production From a Fractured Well With Well Inflow Limited to Part of the Fracture HeightSPE Production Engineering, 1986
- Fractured Well Responses in Heterogeneous Systems—Application to Devonian Shale and Austin Chalk ReservoirsJournal of Energy Resources Technology, 1986
- Transient Pressure Behavior for a Well With a Finite-Conductivity Vertical FractureSociety of Petroleum Engineers Journal, 1978
- Determination of the Orientation of a Vertical Fracture by Interference TestsJournal of Petroleum Technology, 1977
- Unsteady-State Pressure Distributions Created by a Well With a Single Infinite-Conductivity Vertical FractureSociety of Petroleum Engineers Journal, 1974
- The Effect of Slant Hole, Drainhole, and Lateral Hole Drilling on Well ProductivityJournal of Petroleum Technology, 1955