A load-routeing problem in a tandem-configuration automated guided-vehicle system
Authors:
- 1 February 1994
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 32 (2) , 411-427
Abstract
Automated guided vehicles are commonly employed in modern automated material-handling systems or flexible manufacturing systems. A new configuration for an automated guided-vehicle system (AGVS), called a tandem AGVS, has been proposed recently. Efficient use of this configuration is required to solve the load-routeing problem (LRP), a specific operational issue which affects the production system performance. In this paper, LRPs are studied and a two-phase approach is proposed to solve it. Phase 1 consists of an analytical approach based on the steady state. The output of phase 1 provides an adequate estimate and recommendation of routeing decisions of an operational system. Phase 2 is a simulation model which accepts the results from phase 1 to realize the impact of another operational performance such as the queue length of each station. It has been established that the LRP affects the operational performance of the AGVS.Keywords
This publication has 13 references indexed in Scilit:
- Conflict-free shortest-time bidirectional AGV routeingInternational Journal of Production Research, 1991
- Intersection graph method for AGV flow path designInternational Journal of Production Research, 1991
- Conflict detection of automated guided vehicles: a Petri net approachInternational Journal of Production Research, 1991
- Tandem Configurations for Automated Guided Vehicle Systems and the Analysis of Single Vehicle LoopsIIE Transactions, 1991
- A model for the design of zone control automated guided vehicle systemsInternational Journal of Production Research, 1990
- Optimal flow path design of unidirectional AGV systemsInternational Journal of Production Research, 1990
- Guide path design and location of load pick-up/drop-off points for an automated guided vehicle systemInternational Journal of Production Research, 1990
- Decentralized Control of Automated Guided Vehicles on a Simple LoopIIE Transactions, 1989
- Flow path design for automated guided vehicle systemsInternational Journal of Production Research, 1987
- Design of Automatic Guided Vehicle SystemsIIE Transactions, 1982