Abstract
This paper deals with the job shop problem of simultaneous scheduling of production operations and preventive maintenance tasks. To solve this problem, we develop an elitist multi-objective genetic algorithm that provides a set of Pareto optimal solutions minimising the makespan and the total maintenance cost. A deep study was made to choose the best encoding, operators, and the different probabilities. Some lower bounds of the adopted criteria are developed. The computational experiments carried out on a set of published instances validate the efficiency of the proposed algorithm.

This publication has 39 references indexed in Scilit: