Water-sand mixture inrush through weakly cemented overburden at a shallow depth in the Yili coal mining area
Authors:
- 4 June 2021
- journal article
- research article
- Published by Springer Nature in Arabian Journal of Geosciences
- Vol. 14 (12) , 1-12
Abstract
No abstract availableKeywords
Funding Information
- Chinese 13th Five-Year Key Research and Development Program (2017YFC0804100)
- Xi′an Research Institute of the China Coal Technology & Engineering Group Corp. Technology Innovation Fund (2018XAYMS11)
This publication has 11 references indexed in Scilit:
- Study on Gas Emission Prediction of Steeply Inclined Coal Seam Applied Horizontal Slice MiningJournal of Engineering Science and Technology Review, 2019
- Experimental investigation on chemical grouting of inclined fracture to control sand and water flowTunnelling and Underground Space Technology, 2019
- Mechanism and Remediation of Water and Sand Inrush Induced in an Inclined Shaft by Large-Tonnage VehiclesMine Water and the Environment, 2018
- Experimental Modeling of Quicksand with Transparent Soil through an OrificeGeotechnical Testing Journal, 2017
- An experimental investigation on the speed of sand flow through a fixed porous bedScientific Reports, 2017
- Protection against water or mud inrush in tunnels by grouting: A reviewJournal of Rock Mechanics and Geotechnical Engineering, 2016
- Interactions of overburden failure zones due to multiple-seam mining using longwall cavingBulletin of Engineering Geology and the Environment, 2014
- Two-dimensional granular Poiseuille flow on an incline: Multiple dynamical regimesPhysical Review E, 2001
- Fingering in granular flowsNature, 1997
- Discussion: A discrete numerical model for granular assembliesGéotechnique, 1980