The relative significance of forecast errors in multistage manufacturing
Authors:
- Larry P. RitzmanLRLarry P. Ritzman
- Barry E. KingBKBarry E. King
- 1 March 1993
- journal article
- Published by Wiley in Journal of Operations Management
- Vol. 11 (1) , 51-65
Abstract
It is intuitive that controlling forecast errors should result in better customer service and lower inventories. But forecast errors come from various sources. Multistage manufacturing experiences supply and lead‐time uncertainties as well as demand uncertainties, and manufacturing has more than one lever to pull when addressing these uncertainties. The relationship of forecast errors to manufacturing performance is not clear. Furthermore, the pursuit of forecast accuracy may not be the best use of managerial resources. In this study, using a many‐factored manufacturing simulation, we examine two components of forecast errors, the mix of special and standard products, lot‐sizing, and buffering policies as they affect inventories and customer service. Although most conclusions are situation dependent, reducing forecast bias is shown to be much preferred to reducing forecast variability, bias management is more important to on‐time delivery than to inventory reduction, and the value of such reductions is particularly important in situations where there are large lot‐sizes and small buffers.Keywords
This publication has 10 references indexed in Scilit:
- Resource Flexibility Issues in Multistage ManufacturingDecision Sciences, 1990
- The behavior of lot‐sizing procedures in the presence of forecast errorsJournal of Operations Management, 1989
- AN EVALUATION OF FORECAST ERROR IN MASTER PRODUCTION SCHEDULING FOR MATERIAL REQUIREMENTS PLANNING SYSTEMS.Decision Sciences, 1987
- Kanban, MRP, and Shaping the Manufacturing EnvironmentManagement Science, 1987
- Forecasting Error Evaluation in Material Requirements Planning (MRP) Production-Inventory SystemsManagement Science, 1986
- COMMENTS ON “COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING”: A VERIFICATION OF ORDERING PROBABILITIESDecision Sciences, 1985
- COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZINGDecision Sciences, 1983
- THE EFFECT AND COST OF FORECAST ERROR BIAS FOR MULTIPLE‐STAGE PRODUCTION‐INVENTORY SYSTEMSDecision Sciences, 1982
- HEURISTIC LOT‐SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION‐INVENTORY SYSTEMDecision Sciences, 1979
- Consistency and Optimality in Managerial Decision MakingManagement Science, 1963