Program Update on the Development and Demonstration of a HTS Power Cable to Operate in the Long Island Power Authority Transmission Grid
- 1 June 2007
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE) in 2007 IEEE Power Engineering Society General Meeting
- Vol. 15 (19325517) , 1-4
Abstract
The US Department of Energy is currently funding the design, development and demonstration of the first long length, transmission level voltage, cold dielectric, high temperature superconductor power cable. The cable is designed for permanent installation in the Long Island Power Authority (LIPA) grid and will be able to carry 574 MVA at a voltage of 138 KV. The project is led by American Superconductor and the team is comprised of Nexans, Air Liquide and LIPA. This paper will describe the goals of the project, an overview of the cable design, refrigeration system and site design. It will also include the statistics of the HTS wire manufactured for this project, the results of the qualification testing on a prototype 30 meter cable and the preparation work of the refrigerator system. The cable will be completed and put into service in the LIPA grid in 2007.Keywords
This publication has 5 references indexed in Scilit:
- Fault Management of a Cold Dielectric HTS Power Transmission CableJournal of Physics: Conference Series, 2006
- Design and Experimental Results for Albany HTS CableIEEE Transactions on Applied Superconductivity, 2005
- Manufacturing and Installation of the World's Longest HTS Cable in the Super-ACE ProjectIEEE Transactions on Applied Superconductivity, 2005
- Long length manufacturing of high performance BSCCO-2223 tape for the Detroit Edison Power Cable ProjectIEEE Transactions on Applied Superconductivity, 2001
- Development of HTS power transmission cablesIEEE Transactions on Applied Superconductivity, 1999