Minimizing makespan on a two-machine re-entrant flowshop
- 1 July 2007
- journal article
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 58 (7) , 972-981
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshopInternational Journal of Production Research, 2005
- The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtimeEuropean Journal of Operational Research, 2003
- Decomposition methods for reentrant flow shops with sequence-dependent setup timesJournal of Scheduling, 2000
- A heuristic algorithm for two‐machine re‐entrant shop schedulingAnnals of Operations Research, 1999
- Production sequencing problem with reentrant work flows and sequence dependent setup timesComputers & Industrial Engineering, 1997
- Mean Flow Time Minimization in Reentrant Job Shops with a HubOperations Research, 1996
- Heuristics for Flowshop Scheduling Problems Minimizing Mean TardinessJournal of the Operational Research Society, 1993
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near OptimumJournal of the Operational Research Society, 1965
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954