Contractor-Based Evaluation of Construction Cost Overrun Factors Using Matrix Analysis
Open Access
Abstract
The construction cost overrun is an important issue that should be addressed, as it directly impacts many construction companies. Our research objective is to study and rank the impacts of empirical attitudes on construction cost overruns using the matrix analysis method. The research began with a focus group of 78 respondents, including 40 project engineers from contractor construction companies, 18 heads of government sectors related to construction projects, and 20 construction academicians. Based on expert interviews and the focus group discussion, 13 relevant factors were identified, and a questionnaire survey was subsequently conducted for data collection. The results showed that labor shortages were the most important factor influencing construction cost overruns, with the highest eigenvector value of 0.1687. The ranking of factors based on the percentages of average construction cost overruns includes labor shortages, variation orders, financial capacity, material price fluctuations, and drawing conditions, accounting for 18.3%, 15.7%, 12.8%, 10.2%, and 9.0%, respectively. These findings demonstrate the applicability of matrix analysis as a systematic approach for prioritizing empirical managerial attitudes influencing construction cost overruns, thereby providing a structured basis for decision-making in construction cost risk management.Keywords
This publication has 35 references indexed in Scilit:
- Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projectsAlexandria Engineering Journal, 2023
- Is the Australian construction industry prepared for climate change?Building and Environment, 2019
- Time Delay and Cost Overrun in Qatari Public Construction ProjectsProcedia Engineering, 2016
- Owners’ Perspective of Factors Contributing to Project Delay: Case Studies of Road and Bridge Projects in Saudi ArabiaProcedia Engineering, 2016
- Cost overrun in the Malaysian construction industry projects: A deeper insightInternational Journal of Project Management, 2014
- Factors Affecting Cost Overruns in Micro-scaled Construction CompaniesProcedia Engineering, 2014
- Time Extension Factors in Construction Industry of PakistanProcedia Engineering, 2014
- Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industryInternational Journal of Project Management, 2008
- Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approachInternational Journal of Project Management, 2004
- Construction delays in a fast-growing economy: Comparing Thailand with other economiesInternational Journal of Project Management, 1996