ROBOT TASK SCHEDULING IN A FLEXIBLE MANUFACTURING CELL
Authors:
- 1 March 1993
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 25 (2) , 80-87
Abstract
Effective sequencing and scheduling of the material handling system can have a major impact on the productivity of the manufacturing system. This is especially true in the case where material handling times are on par with machine processing times. In a dynamic, real-time environment, the optimal solution of this scheduling problem may be computationally infeasible. In this paper, we develop a branch and bound approach which is coupled with quick, effective bounds to optimize the movement of a robot which serves the material handling requirements within a manufacturing cell. Computational results are given which explore the tradeoff between computation time and deviation from optimal for different scenarios.Keywords
This publication has 10 references indexed in Scilit:
- Loading a flexible manufacturing systemInternational Journal of Production Research, 1987
- Flexible Manufacturing Systems: A Review of Analytical ModelsManagement Science, 1986
- On Approximate Queueing Models of Dynamic Job ShopsManagement Science, 1985
- A flexible multiobjective production planning framework for automated manufacturing systemsEngineering Costs and Production Economics, 1984
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing SystemsManagement Science, 1983
- Loading and control policies for a flexible manufacturing systemInternational Journal of Production Research, 1981
- Models for Understanding Flexible Manufacturing SystemsA I I E Transactions, 1980
- Complexity of Scheduling under Precedence ConstraintsOperations Research, 1978
- A Generalized Machine-Scheduling AlgorithmJournal of the Operational Research Society, 1970
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954