Managing grade risk in stope design optimisation: probabilistic mathematical programming model and application in sublevel stoping
Authors:
- N. GriecoNGN. Grieco
- R. DimitrakopoulosRDR. Dimitrakopoulos
- 1 June 2007
- journal article
- Published by SAGE Publications in Mining Technology: Transactions of the Institutions of Mining and Metallurgy
- Vol. 116 (2) , 49-57
Abstract
Optimising stope design is an intricate element of underground mine planning where optimal designs are expected to integrate multiple technical aspects. Orebody uncertainty is a critical aspect affecting the forecasted performance of designs and is linked to the failing of meeting production targets and project financial expectations. Following recent conceptual developments in open pit mining, the present paper develops and explores a new probabilistic mixed integer programming model developed to optimise stope designs, including size, location and number of stopes under consideration of grade uncertainty and predefined levels of acceptable risk. An application of the method at Kidd Creek Mine, Ont., Canada, demonstrates its practical aspects including risk quantification for contained ore tonnes, grade and economic potential.Keywords
This publication has 3 references indexed in Scilit:
- Generalized Sequential Gaussian Simulation on Group Size ν and Screen-Effect Approximations for Large Field SimulationsMathematical Geology, 2004
- Geostatistics for Natural Resources Evaluation1997
- An application of integer programming and simulation to production planning for a stratiform ore bodyMining Science and Technology, 1990