Theoretical framework of the causes of construction time and cost overruns
Authors:
Open Access
- 1 November 2017
- conference paper
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 271 (1) , 012032
Abstract
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.Keywords
This publication has 19 references indexed in Scilit:
- PPPs and Project Overruns: Evidence from Road Projects in IndiaJournal of Construction Engineering and Management, 2014
- Magnitude of Construction Cost and Schedule Overruns in Public Work ProjectsJournal of Construction Engineering, 2013
- Determining the Probability of Project Cost OverrunsJournal of Construction Engineering and Management, 2013
- Significant Factors Causing Cost Overruns in Large Construction Projects in MalaysiaJournal of Applied Sciences, 2013
- Analysis of Time and Cost Overrun in Malaysian ConstructionAdvanced Materials Research, 2012
- Mathematical Expressions for Explaining Project Delays in Southwestern NigeriaSingapore Journal of Scientific Research, 2011
- Cost and time control of construction projects: inhibiting factors and mitigating measures in practiceConstruction Management and Economics, 2010
- Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and PortsJournal of Urban Planning and Development, 2008
- The significant factors causing delay of building construction projects in MalaysiaEngineering, Construction and Architectural Management, 2007
- Reasons for Cost and Schedule Increase for Engineering Design ProjectsJournal of Management in Engineering, 2002