Structural Behavior of a Long-Span Partially Earth-Anchored Cable-Stayed Bridge during Installation of a Key Segment by Thermal Prestressing
Open Access
- 17 August 2016
- journal article
- research article
- Published by MDPI AG in Applied Sciences
- Vol. 6 (8) , 231
Abstract
This study investigated structural behavior of long-span partially earth-anchored cable-stayed bridges with a main span length of 810 m that use a new key segment closing method based on a thermal prestressing technique. A detailed construction sequence analysis matched with the free cantilever method (FCM) was performed using a three-dimensional finite element (FE) model of a partially earth-anchored cable-stayed bridge. The new method offers an effective way of connecting key segments by avoiding large movements resulting from the removal of the longitudinal restraint owing to the asymmetry of axial forces in the girders near the pylons. The new method develops new member forces through the process of heating the cantilever system before installing the key segment and cooling the system continuously after installing key segments. The resulting forces developed by the thermal process enhance the structural behavior of partially earth-anchored cable-stayed bridges owing to decreased axial forces in the girders.Keywords
This publication has 16 references indexed in Scilit:
- Partially Earth-Anchored Cable Bridge: Ultralong-Span System Suitable for Carbon-Fiber-Reinforced Plastic CablesJournal of Bridge Engineering, 2016
- Temperature variation in steel box girders of cable-stayed bridges during constructionJournal of Constructional Steel Research, 2015
- Damage detection and localization on a benchmark cable-stayed bridgeEarthquakes and Structures, 2015
- Extending the Benchmark Cable-Stayed Bridge for Transverse Response under Seismic LoadingJournal of Bridge Engineering, 2014
- Refined optimal passive control of buffeting-induced wind loading of a suspension bridgeWind and Structures, 2014
- Vibration based damage localization using MEMS on a suspension bridge modelSmart Structures and Systems, 2013
- Innovative Key-Segment Closing Method Using Thermal Prestressing Technique for Partially Earth-Anchored Cable-Stayed BridgesAdvances in Structural Engineering, 2008
- An experimental investigation of thermal prestressing method for continuous composite steel girder bridgesMagazine of Concrete Research, 2007
- An analytical investigation of thermal prestressing method for continuous composite girder bridgesMagazine of Concrete Research, 2007
- Feasibility of a 1,400 m Span Steel Cable-Stayed BridgeJournal of Bridge Engineering, 2004