The cost of electricity interruptions in Portugal: Valuing lost load by applying the production-function approach
Authors:
- Rui CastroRui Castro
- Sérgio FaiasSFSérgio Faias
- Jorge EstevesJEJorge Esteves
- 1 June 2016
- journal article
- Published by Elsevier in Utilities Policy
- Vol. 40, 48-57
Abstract
No abstract availableKeywords
Funding Information
- Fundação para a Ciência e a Tecnologia (UID/CEC/50021/2013)
This publication has 13 references indexed in Scilit:
- The costs of electricity interruptions in Spain. Are we sending the right signals?Energy Policy, 2013
- An estimate of the value of lost load for IrelandEnergy Policy, 2011
- Social cost-efficient service quality—Integrating customer valuation in incentive regulation: Evidence from the case of NorwayEnergy Policy, 2010
- Customer Costs Related to Interruptions and Voltage Problems: Methodology and ResultsIEEE Transactions on Power Systems, 2008
- Service quality in the electricity industry: The role of privatization and managerial behaviorEnergy Policy, 2007
- The value of supply securityEnergy Economics, 2007
- Quality regulation of electricity distribution in Italy: an evaluation studyEnergy Policy, 2006
- Benchmarking and incentive regulation of quality of service: an application to the UK electricity distribution networksEnergy Policy, 2005
- Economic regulation of quality in electricity distribution networksUtilities Policy, 2005
- A Theory of the Allocation of TimeThe Economic Journal, 1965