Long-term water budget estimation with the modified distributed model – LISFLOOD-WB over the Lushi basin, China
Authors:
- 26 March 2004
- journal article
- Published by Springer Nature in Meteorology and Atmospheric Physics
- Vol. 90 (1-2) , 1-16
Abstract
No abstract availableKeywords
This publication has 31 references indexed in Scilit:
- Equifinality, data assimilation, and uncertainty estimation in mechanistic modelling of complex environmental systems using the GLUE methodologyJournal of Hydrology, 2001
- Simulation of the water budget and the river flows of the Rhone basin from 1981 to 1994Journal of Hydrology, 2001
- Physically based river basin modelling within a GIS: the LISFLOOD modelHydrological Processes, 2000
- The ISBA surface scheme in a macroscale hydrological model applied to the Hapex-Mobilhy areaJournal of Hydrology, 1999
- A Land Surface Water Deficit Model for an Arid and Semiarid Region: Impact of Desertification on the Water Deficit Status in the Loess Plateau, ChinaJournal of Climate, 1999
- A biophysical process-based estimate of global land surface evaporation using satellite and ancillary data I. Model description and comparison with observationsJournal of Hydrology, 1998
- The future of distributed models: Model calibration and uncertainty predictionHydrological Processes, 1992
- A land‐surface hydrology parameterization with subgrid variability for general circulation modelsJournal of Geophysical Research: Atmospheres, 1992
- A rainfall–runoff scheme for use in the Hamburg climate model1992
- Analysis of an empirical model for soil heat flux under a growing wheat crop for estimating evaporation by an infrared-temperature based energy balance equationAgricultural and Forest Meteorology, 1987