Threshold accepting and Ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming
Authors:
- S. MarimuthuSMS. Marimuthu
- S.G. PonnambalamSPS.G. Ponnambalam
- N. JawaharNJN. Jawahar
- 1 January 2009
- journal article
- Published by Elsevier in Journal of Materials Processing Technology
- Vol. 209 (2) , 1026-1041
Abstract
No abstract availableKeywords
This publication has 49 references indexed in Scilit:
- Lot streaming for product assembly in job shop environmentRobotics and Computer-Integrated Manufacturing, 2008
- Lot-sizing scheduling with batch setup timesJournal of Scheduling, 2006
- Cost models for lot streaming in a multistage flow shopOmega, 2005
- Lot streaming models with a limited number of capacitated transporters in multistage batch production systemsComputers & Operations Research, 2004
- Multi-objective lot splitting for a single productm-machine flowshop lineIIE Transactions, 2004
- Lot splitting to minimize average flow-time in a two-machine flow-shopIIE Transactions, 2002
- Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-upsInternational Journal of Production Research, 1997
- Lot streaming in the two-machine flow shop with setup timesAnnals of Operations Research, 1995
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times SeparatedJournal of the Operational Research Society, 1994
- Solution Procedures for the Lot‐Streaming ProblemDecision Sciences, 1990