A MODEL FOR EVALUATING THE RISK EFFECTS ON CONSTRUCTION PROJECT ACTIVITIES
Open Access
- 2 July 2019
- journal article
- research article
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 25 (7) , 687-699
Abstract
Cost overruns and time delays are considered to be very important challenges for the majority of construction projects. These challenges are typically attributed to their associated risks. Due to the risky and uncertain nature of construction projects, an increasing amount of attention is given to estimating and overcoming cost overruns and time delays. New techniques are being developed to help project managers to contractually complete projects within cost and time constraints. The objective of this study was to develop a new qualitative and quantitative risk analysis model that can be employed for construction projects. The proposed model, which is based on a fuzzy logic tool, consists of two modules for assessing risk factors that affect the main construction activities and computing the expected cost overruns and time delays that are associated with these risks. Using numerous logical rules, the model applies the probability of occurrences and impacts of the risks on the cost and time of the main activities. The Spearman and Kendall correlation coefficient tests are applied to verify and select a suitable membership function. Using four proposed membership functions, the results of these tests confirmed that the triangle membership function is suitable for the model. The model is verified by application to HVAC system activities in two actual construction projects, which serve as case studies. Two different methods are proposed and applied to quantify the cost overruns and time delays. The first method is based on determining the cost overruns and time delay values for each activity according to their weight in the system. Triple premise rules are proposed and applied in the second method, which is established to relate all activities. The results from the second method are more accurate compared with the first method based on actual data from the case study projects. In addition, the results demonstrated that the proposed model can be used to quantify the expected cost overrun and time delays in construction project activities and can be generalized and implemented in different construction activities.Keywords
This publication has 17 references indexed in Scilit:
- A DECISION SUPPORT MODEL FOR CIVIL ENGINEERING PROJECTS BASED ON MULTI-CRITERIA AND VARIOUS DATAJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019
- PROJECT RISK EVALUATION BY USING A NEW FUZZY MODEL BASED ON ELENA GUIDELINEJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2018
- Risk and Uncertainty Assessment Model in Construction Projects Using Fuzzy LogicAmerican Journal of Civil Engineering, 2016
- Identifying and Evaluating Risks of Construction Projects in Fuzzy Environment: A Case Study in Iranian Construction IndustryIndian Journal of Science and Technology, 2012
- Optimum risk allocation model for construction contracts: fuzzy TOPSIS approachCanadian Journal of Civil Engineering, 2012
- Developing an Assessment Model for Factors Affecting the Quality in the Construction IndustryJournal of Civil Engineering and Architecture, 2012
- Development of project cost contingency estimation model using risk analysis and fuzzy expert systemExpert Systems with Applications, 2011
- Using fuzzy risk assessment to rate cost overrun risk in international construction projectsInternational Journal of Project Management, 2007
- A fuzzy approach to construction project risk assessment and analysis: construction project risk management systemAdvances in Engineering Software, 2001
- A proposal for construction project risk assessment using fuzzy logicConstruction Management and Economics, 2000