Abstract
A specific pavement maintenance treatment can deal with many pavement distresses, while a specific pavement condition can be improved by many different pavement maintenance treatments. This makes it difficult to develop a generalized method for treatment selection. In this paper, the problem is approached as a multi-objective optimization problem and the Ideal Point Method (IPM), mathematics technique is applied to address these concerns. The indicators, including a performance jump of present serviceability index, treatment service life, and equivalent annual cost are used in the multi-objective optimization model to determine the adequate treatment. A case study focusing on the optimization of three pavement preventative treatments is presented. A benefit-cost ratio model is presented for comparison. A comparison between the two methods suggests that the ideal point method is more objective. The proposed model provides a new way to optimize the selection of pavement maintenance treatments and can lead to profound implications for maintenance and rehabilitation decision-making.

This publication has 3 references indexed in Scilit: